GSR_283_E_Railway Claims Tribunal (Procedure) Amendment Rules, 2007

Rule, 2007

A rule made under the The Railway Claims Tribunal Act, 1987.

Kind Rule Year 2007 Jurisdiction Central Ministry Railways Text 2,085 characters

Made under The Railway Claims Tribunal Act, 1987.

Source document (PDF, 60 KB)

Text

Reproduced from the document India Code holds for this instrument. The Gazette prints Hindi and English side by side and this is the English; the Department's own PDF remains the authority.

Che Gazette of India EXTRAORDINARY ~ Wire & waniitt

PUBLISHED BY AUTHORITY

No. 178] NEW DELHI, WEDNESDAY, APRIL ‘11, 2007/CHAITRA 21, 1929 BUA. 70031) TRA 26-11-1991, ALLA. 438( a1) afrgert ane 21-4-1992, SLarfL 509(30) ata 15-6-1994, wilecal sar waht aed ER, te ear aifireen (afer) fram, 1989 a ak teh Hea SF fae fetahad fron at 2, aeiq — LG) oF fret an Sfire an ta aren afr (afiwer) ater fre, 2007 1

2. ta are arftrerr (afar) Fram, 1989 at anpet 1A was 11 3 A vfahedt & err Ty, Prafafad waft tat semi, arafq — “TR Wee SF eae, cafe, afer, Mag, aT, [or @. 2005/8 a (anette 4-7/8 T-11] arhrarad 3e4 aged ara 4-2-1997, Bua. 719(8) TRH 15-10-1999, BULA. 167( 31) ARTE 29-2-2000, avai, 51331) TS 9-7-2001, SLaLfs. 787(8) wre 2-12-2002, Sra Gates fren aT

MINISTRY OF RAILWAYS

(RAILWAY BOARD)

NOTIFICATION

New Delhi, the 11th April, 2007

G.S.R. 283(E).—In exercise of the powers conferred by Section 30 of the Railway Claims Tribunal Act, 1987 (54 ’ of 1987), the Central Government hereby makes the following ‘rules further to amend the Railway Claims Tribunal (Procedure) Rules, 1989, namely :-— These rules-may be called the Railway ‘1. @ . Claims Tribunal (Procedure) Amendment Rules, 2007.

(2) They shall come into force on the date of their publication in the Official Gazette,

2. Inthe Railway Claims Tribunal (Procedure) Rules, 1989, in the Schedule 1 at serial number 11, fos the entry in column 3, the following entry shall be substituted namely -— "Districts of Gorakhpur, Deoria, Ballia, Gazipur, Azamgarh, Mau. Basti. Siddarthnagar, Mirzapur, Robertsganj, Jaunpur, Faizabad, Gonda, Bahraich, Varanasi, Maharaj Gianj, Kushinagar, Shravasti, Sant Kabir Nagar, Chandauli, Sant Ravi Das Nagar, Balrampur and Ambedkar Nagar of Uttar Pradesh.”

8. I. MEENA, Executive Director, Foot Note :—The Principal rules were published vide number

G.S.R. 842(E) dated the 19th September, 1989, and dated 15-2-2006 and G.S.R. 498(F) dated 23-$-2006.

wed by the Manager, Govt. of India Press, Ring Road, Mayapuri, New ‘Delhi-| L006 at and Published by the Controller of Publivations, Delhi- 110054.

Provisions this rule answers to

Read out of the instrument itself: an enabling provision is one it says it was made under, which is the power it rests on. The rest it names without resting on.

Other instruments under the same Act

All of the The Railway Claims Tribunal Act, 1987

Source and method. Compiled from the enactments of Parliament and of the State legislatures as published on India Code, and republished together with commentary and other original matter under section 52(1)(q)(ii) of the Copyright Act, 1957. Structured, cross-referenced and maintained by eCourtsIndia. Recorded by India Code; the text, where shown, is what its own document carried. This page is not a substitute for legal advice.