Reproduced from the document India Code holds for this instrument. The Gazette prints Hindi and English side by side and this is the English; the Department's own PDF remains the authority. This instrument is long and the text is cut off here — follow the source for the remainder.

Government of India Ministry of Mines

MINERAL CONSERVATION AND

DEVELOPMENT RULES, 1988

(As amended up to 2 nd August, 2011) Issued by

CONTROLLER GENERAL

INDIAN BUREAU OF MINES

NAGPUR

August, 2011 Price: (Inland) Rs. 200.00; (Foreign) £ 02.59 or $ 04.35 Printed at IBM Press, 16/500/August, 2011

CONTENTS

Rule Page No.

CHAPTER - I

Preliminary

1. Short title and commencement 2

2. Application 2

3. Definitions 2

CHAPTER - IA

Reconnaissance Operations 3A. Scheme of reconnaissance 5 3B. Modification of scheme of reconnaissance 5 3C. Reconnaissance operations to be carried out in 5 accordance with scheme of reconnaissance 3D. Intimation about reconnaissance operations 5 3E. Submission of reports about reconnaissance operations 5

CHAPTER - II

Prospecting Operations

4. Scheme of prospecting 6

5. Modification of scheme of prospecting 6

6. Prospecting operation to be carried out in 7 accordance with scheme of prospecting

7. Intimation about prospecting operations 7

8. Report of prospecting operations 7

CHAPTER - III

Mining Operations

9. Mining plan 8

10. Modification of mining plan 8

11. Mining plan to be submitted by the 8 existing lessee

12. Review of mining plan 9

13. Mining operations to be in accordance 10 with mining plans

14. Prospecting and mining operations 10

15. Opencast working 10

16. Separate stacking of non-salable minerals 11

17. Underground mining operations 11

18. Subgrade minerals to be brought to surface 11

19. Prohibition of reduction of blocks 12

20. Beneficiation studies to be carried out 12

21. Machinery and plant 12

22. Notice for opening of mine 13

23. Abandonment of mines 13 23A. Mine Closure Plan 14 23B. Submission of Progressive Mine Closure Plan 14 23C. Submission of final mine closure plan 14 23D. The modification of mine closure plan 15 23E. Responsibility of the holder of mining lease 15

24. Notice of temporary discontinuance of work in mines 16

25. Intimation of reopening of a mine 17

26. Stoping of vein, etc. 17

CHAPTER - IV

Plans and Sections

27. General requirements about plans and sections 18

28. Types of plans and sections 19

29. Copies of plans and sections to be submitted 22

30. Preparation of plans 22

CHAPTER - V

Environment

31. Protection of environment 23

32. Removal and utilisation of top soil 23

33. Storage of overburden, waste rock, etc. 23

34. Reclamation and rehabilitation of lands 24

35. Precaution against ground vibrations 24

36. Control of surface subsidence 24

37. Precaution against air pollution 24

38. Discharge of toxic liquid 24

39. Precaution against noise 24

40. Permissible limits and standards 24

41. Restoration of flora 24

CHAPTER - VI

Employment of Qualified persons

42. Employment of geologist and mining engineer 26

43. Duties of geologist 28

44. Duties of mining engineer 29 CHAPTER – VII Notices and Returns

45. Monthly, quarterly and annual returns 30

46. Notice of certain appointments 34

47. Notice of shaft sinking and bore holes 34

48. Records of shafts and boreholes 34

49. Change in the name of mine to be notified 34

50. Notice of transfer of prospecting licence or mining lease 34 50A. Notice of amalgamation of mining lease 35

51. Transfer of records to transferees 35

52. Copies of notices/returns to be submitted to the 35 State Government

53. Copies of notices and returns to be maintained 35

CHAPTER - VIII

Examination of Minerals and Issue of Directives

54. Power to issue directions 36

55. Examination of mineral deposits and taking of samples 36

56. Prohibition of deployment in certain cases 36

CHAPTER - IX

Revision and Penalty

57. Revision 37

58. Penalty 38

CHAPTER - X

Miscellaneous

59. Preservation of cores, etc. 39

60. Facilities for undertaking research or training 39

61. Submission of records/reports regarding research 39 in geology or mining

62. Territorial jurisdiction of Controller of Mines/ 39 Regional Controller

63. Obligation to supply other information 40

64. Provisions of these rules to be applicable to Government 40

65. Chief Controller of Mines etc. to exercise powers 40 of the Regional Controller of Mines

66. Repeal and savings 40

SCHEDULE

Form D-1 ------------------------------------------------------------------- 54

GUIDELINES FOR SUBMISSION OF RETURNS 167

GUIDELINES UNDER MCDR FOR UNITED NATIONS 169

FRAMEWORK CLASSIFICATION OF MINERAL

RESERVES / RESOURCES

1 and 2 Omitted by

G.S.R.75(E) dated 9.2.2011

GOVERNMENT OF INDIA

(BHARAT SARKAR)

MINISTRY OF STEEL AND MINES

(ISPAT AUR KHAN MANTRALAYA)

DEPARTMENT OF MINES

(KHAN VIBHAG) New Delhi, the 24 th October, 1988

NOTIFICATION

G.S.R.No.1023 (E). In exercise of the powers conferred by section 18 of the Mines and Minerals (Regulation and Development) Act, 1957 (67 of 1957), the Central Government hereby makes the following rules for conservation and development of minerals, namely:

CHAPTER - I

Preliminary

1. Short title and commencement : - [(1) These rules may be called the Mineral Conservation and Development (Amendment) Rules, 2010.

(2) They shall come into force on the date of their publication in the Official Gazette.]

2. Application :- These rules shall apply to all minerals except : -

(i) petroleum and natural gas;

(ii) coal, lignite and sand for stowing;

(iii) any mineral declared as prescribed substance for the purpose of the Atomic Energy Act, 1962 (33 of 1962); and

3. Definitions : - In these rules, unless the context otherwise requires:- [(a) “abandonment of mine” means final closure of a mine either whole or part thereof when the mineral deposits within mine or part thereof, have been fully extracted or when the mining operations have become uneconomic;] [(aa)] "Act" means the Mines and Minerals (Development and Regulation) Act, 1957 (67 of 1957);

(b) "agent", when used in relation to a mine, means any person whether appointed as such or not, who acts as the representative of the owner in respect of the management of the mine or any part thereof;

(c) "authorised officer" means any officer of the Indian Bureau of Mines duly authorised in writing by the Controller General, Indian Bureau of Mines to perform the functions under these rules;

(d) "beneficiation" means processing of minerals or ores for the purpose of –

(i) regulating the size of a desired produce;

(ii) removing unwanted constituents; and

(iii) improving quality, purity or assay grade of desired product;

(e) "boring" or "drilling" means the penetration of alluvial material, rocks or formations by holes for obtaining geological information, and for drawing samples therefrom;

(f) "Chief Controller of Mines" means the Chief Controller of Mines of the Indian Bureau of Mines;

(g) "Controller General" means the Controller General of the Indian Bureau of Mines;

(h) "Controller of Mines" means the Controller of Mines of the Indian Bureau of Mines;

(i) "development" means the driving of an opening to, or in an ore-body or seam or removing overburden or unproductive or waste materials as preparatory to mining or stoping;

(j) "environment" and "environmental pollution", shall have the same meanings, assigned respectively to these terms in the Environment (Protection) Act, 1986 (29 of 1986);

[(jj) “final mine closure plan” means a plan for the purpose of decommissioning, reclamation and rehabilitation in the mine or part thereof after cessation of mining and mineral processing operations that has been prepared in the manner specified in the standard format and guidelines issued by the Indian Bureau of Mines;

(jjj) “financial assurance” means the sureties furnished by the leaseholder to the competent authority so as to indemnify the authorities against the reclamation and rehabilitation cost;]

(k) "Form" means a Form set forth in Schedule to these rules;

(l) "geologist" means a person appointed in writing by the owner or agent to perform the duties of a geologist under these rules;

(m) "manager" when used in relation to a mine, means any person appointed by the owner or agent and includes the owner or the agent if he appoints himself to be such manager, under section 17 of the Mines Act, 1952 (35 of 1952); [(mm) “mine closure” means steps taken for reclamation, rehabilitation measures taken in respect of a mine or part thereof commencing from cessation of mining or processing operations in a mine or part thereof;]

(n) "mining engineer" means a person appointed in writing by the owner or agent to perform the duties of a mining engineer under these rules;

(o) "mining plan" means a mining plan prepared under section 5 of the Act and the rules made thereunder ;

[(oo) “progressive mine closure plan” means a progressive plan, for the purpose of providing protective, reclamation and rehabilitation measures in a mine or part thereof that has been prepared in the manner specified in the standard format and guidelines issued by Indian Bureau of Mines;]

(p) "prospect" means an area where prospecting operations for minerals are being carried out and includes any area held under prospecting licence;

(q) "recognised person" means a person granted recognition by the competent authority to prepare mining plan;

(r) "Regional Controller" means the Regional Controller of Mines of the Indian Bureau of Mines;

(s) "shaft" means a vertical or inclined way or opening leading from the surface to workings below ground or from one part of the workings below ground to another, and includes an incline;

(t) "stoping" means making any underground excavation other than development working made for the purpose of winning ores or minerals and includes extraction or splitting or reduction of pillars or blocks of minerals;

[(tt) “temporary discontinuance” means the planned or unplanned suspension of mining operations in a mine or part thereof and where the operations are likely to be resumed after certain time;]

(u) "year" means the twelve months period beginning from the first day of April and ending on the thirty-first day of March of the following year;

(v) all other words and expressions used in these rules but not defined shall have the meanings respectively assigned to them in the Act.

[CHAPTER - I A Reconnaissance Operations 3A. Scheme of reconnaissance : - Every holder of a reconnaissance permit shall submit to the Controller General and the Regional Controller or the authorised officer within a period of sixty days from the date of execution of the reconnaissance permit, a scheme of reconnaissance operations indicating the manner in which he proposes to carry out reconnaissance operations in the area covered by the permit and in particular :-

(a) particulars of the area such as aerial extent, boundaries;

(b) the scale of the plan and the area of geological mapping; and

(c) the particulars of the machines and instruments to be used. 3B. Modification of scheme of reconnaissance : -

(1) A reconnaissance scheme prepared and submitted under rule 3A may be modified at any time on geological considerations by the holder of a reconnaissance permit during continuance of the reconnaissance permit.

(2) Any modification carried out under sub-rule (1) shall be intimated to the Controller General and the Regional Controller or the authorised officer by the holder of reconnaissance permit within a period of fifteen days.

3C. Reconnaissance operations to be carried out in accordance with the scheme of reconnaissance : - Every holder of the reconnaissance permit shall carry out the reconnaissance operations in accordance with the scheme of reconnaissance submitted under rule 3A or with such modifications, if any, as intimated under rule 3B, or as directed by the Controller General or Regional Controller or the authorised officer.

3D. Intimation about reconnaissance operations : - Every holder of a reconnaissance permit shall send to the Controller General, Controller of Mines and the Regional Controller, an intimation in Form -AA of the commencement of reconnaissance operations so as to reach them within a period of 15 days of such commencement.

3E. Submission of reports about reconnaissance operations : - Every holder of a reconnaissance permit shall send to the Controller General, Controller of Mines and the Regional Controller an yearly report in Form-BB along with all the aerial, photo-geological, geophysical, geochemical and such other data collected by him as per the conditions stipulated in the reconnaissance permit so as to reach them within thirty days after expiry of every year from the date of execution of the reconnaissance permit or the expiry of the reconnaissance permit or the abandonment of the reconnaissance permit or termination of reconnaissance permit, whichever is earlier.] CHAPTER – II Prospecting Operations

4. Scheme of prospecting : -

(1) Every holder of a prospecting licence shall submit to the Controller General and the Regional Controller or the authorised officer within a period of 60 days from the date of execution of the prospecting licence, a scheme of prospecting indicating the manner in which he proposes to carry out the prospecting operations, in the area covered by the licence and in particular: -

(a) particulars of the area;

(b) the scale of the plan and the area of geological mapping;

(c) the number of pits, trenches, and bore holes which he proposes to put in the area;

(d) the particulars of the machines to be used;

(e) the details of exploratory mining, [ if any, proposed] to be undertaken;

(f) the number of samples proposed to be drawn and analysed;

(g) the beneficiation studies proposed to be undertaken; and

(h) any other matter relevant for the preparation of a scheme of prospecting, as directed by the Controller General or the authorised officer from time to time by a general or specific order.

(2) Notwithstanding anything contained in sub-rule (1) a scheme of prospecting, shall include: -

(a) baseline information of prevailing environmental conditions before the beginning of the prospecting operations;

(b) 2 [steps proposed to be taken for protection of environment which will include] prevention and control of air and water pollution, progressive reclamation and rehabilitation of the land disturbed by the prospecting operations, a scheme for the plantation of trees, and such other measures, as may be directed from time to time by the Controller General or the authorised officer for minimising the adverse effect of prospecting operations on the environment.

(3) The prospecting scheme under sub-rule (1) shall be prepared by a recognised person or a geologist or a mining engineer employed under clause (a) of sub-rule (1) of rule 42.

5. Modification of scheme of prospecting : -

(1) A prospecting scheme prepared and submitted under rule 4 may be modified at any time on geological considerations by the holder of a prospecting licence during continuance of the prospecting licence.

(2) Any modification carried out under sub-rule (1) shall be intimated to the Controller General and the Regional Controller or the authorised officer by the holder of a prospecting licence within a period of fifteen days.

6. Prospecting operation to be carried out in accordance with scheme of prospect- ing :- Every holder of a prospecting licence shall carry out the prospecting operations in accordance with the scheme of prospecting submitted under rule 4 or with such modifications, if any, as intimated under rule 5 or as directed by the Controller General or the authorised officer.

7. Intimation about prospecting operations : - Every holder of a prospecting licence shall send to the Controller General, Controller of Mines and the Regional Controller, an intimation in Form-A of the commencement of prospecting operations so as to reach them within a period of fifteen days of such commencement.

8. Report of prospecting operations : -

(1) Every holder of a prospecting licence shall submit to the Controller General, Controller of Mines and the Regional Controller: -

(a) Omitted.

(b) an yearly report in Form-B so as to reach them within thirty days after the expiry of [twelve months] from the date of execution of the prospecting licence or the expiry of the prospecting licence whichever is earlier:

Provided that in case the prospecting operations are abandoned, the report in Form-B shall be submitted within a period of thirty days from the date of such abandonment: Provided further that in case the prospecting operations are continued for a period exceeding one year, the report in Form-B shall be submitted once every year and a final report in Form–B within a period of three months after the completion of the prospecting operations or the expiry of the prospecting licence, whichever is earlier.

(2) Where prospecting operations are carried out by the authorities specified in the second proviso to sub-section (1) of section 4 of the Act without a prospecting licence, such authority shall submit the annual report in Form-B to the Controller General in respect of each area where prospecting operations have been undertaken by them : Provided that this sub-rule shall not apply in a case where field operation consists of only geological mapping or geo-physical or geo-chemical investigations. CHAPTER – III Mining Operations

9. Mining Plan : -

(1) No person shall commence mining operations in any area except in accordance with a mining plan approved under clause (b) of sub-section (2) of section 5 of the Act.

(2) The Controller General or the authorised officer [or the officer authorised in this behalf by the State Government, as the case may be,] may require the holder of a mining lease to make such modifications in the mining plan referred to in sub-rule (1) or impose such conditions as he may consider necessary by an order in writing if such modifications or imposition of conditions are considered necessary -

(a) in the light of the experience of operation of mining plan;

(b) in view of the change in the technological development.

10. Modification of mining plan : -

(1) A holder of a mining lease desirous of seeking modifications in the approved mining plan as are considered expedient, in the interest of safe and scientific mining, conservation of minerals, or for the protection of environment, shall apply to the Controller General, [ or the officer authorised in this behalf by the State Government, as the case may be,] setting forth the intended modifications and explaining the reasons for such modifications.

(2) The Controller General or the authorised officer, [or the officer authorised in this behalf by the State Government, as the case may be,] may approve the modifications under sub- rule (1) [or approve with such alterations as he may consider expedient within a period of ninety days.]

11. Mining plan to be submitted by the existing lessee :-

(1) Where mining operations have been undertaken before the commencement of these rules without an approved mining plan, the holder of such mining lease shall submit a mining plan within a period of one year from the date of commencement of these rules, [ to the Regional Controller or the authorised officer or the officer authorised in this behalf by the State Government, as the case may be, for approval.]

(2) If a holder of a mining lease has not been able to submit the mining plan within the specified time for reasons beyond his control, he may apply for extension of time giving reasons to the following authorities :

1. Inserted by

G.S.R. 55 (E), dated 17.1.2000. 2. Ibid. 3. Ibid.

(a) to the Regional Controller for extension of time up to six months;

(b) to the Controller of Mines for extension of time exceeding six months but not exceeding one year;

(c) to the Chief Controller of Mines for extension of time beyond one year; [(d) to the officer authorised in this behalf by the State Government in respect of mining plan approved by the State Government.] [(3) The Regional Controller, Controller of Mines, the Chief Controller of Mines or the authorised officer or the officer authorised in this behalf by the State Government, as the case may be, on receiving an application made under sub-rule (2) may, on being satisfied, extend the period for submission of the mining plan for the period mentioned in clause (a), (b), (c) or (d) of the said sub-rule.]

(4) The Regional Controller [or the officer authorised in this behalf by the State Government, as the case may be,] may approve the plan as submitted by the lessee under sub- rule (1) or may require modifications to be carried out in the plan and the lessee shall carry out such modifications and resubmit the modified plan for [omitted.] approval.

[(5) The Regional Controller or the officer authorised in this behalf by the State Government, as the case may be, shall, within a period of 90 days from the date of receipt of the mining plan or the modified mining plan, convey approval or disapproval to the applicant and in case of disapproval shall also convey the reasons for disapproving the said mining plan or the modified mining plan.]

(6) If no decision is conveyed within the period stipulated under sub-rule (5), the mining plan or the modified mining plan, as the case may be, shall be deemed to have been provisionally approved and such approval shall be subject to the final decision whenever communicated.

(7) The mining plan submitted under sub-rule (1) shall be prepared by a recognised person.

12. Review of mining plan : - [ Omitted. ]

(2) The owner, agent, mining engineer or manager of every mine shall review the mining plan as prescribed under sub-rule (1) and submit a scheme of mining for the next five years of the lease to the Regional Controller [or the officer authorised in this behalf by the State Government, as the case may be,] for approval.

(3) The scheme of mining shall be submitted to the Regional Controller [or the officer authorised in this behalf by the State Government, as the case may be,] at least one hundred twenty days before the expiry of the five years period, for which it was approved on the last occasion.

(4) The Regional Controller or the authorised officer [or the officer authorised in this behalf by the State Government, as the case may be,] shall convey his approval or refusal to the scheme of mining within ninety days of the date of its receipt.

(5) If approval or refusal of the scheme of mining is not conveyed to the holder of the mining lease within the stipulated period the scheme of mining shall be deemed to have been provisionally approved and such approval shall be subject to final decision whenever communicated.

(6) The provisions of rules 9, 10 and 13 shall apply to the scheme of mining in the same way as they are applicable to the mining plan.

(7) Every scheme of mining submitted under sub-rule (2) shall be prepared by a recognised person or a person employed under clause (b) of sub-rule (1) of rule 42.

13. Mining operations to be in accordance with mining plans : -

(1) Every holder of a mining lease shall carry out mining operations in accordance with the approved mining plan with such conditions as may have been prescribed under sub-rule (2) of rule 9 or with such modifications, if any, as permitted under rule 10 or the mining plan or scheme approved under rule 11 or 12 as the case may be.

(2) If the mining operations are not carried out in accordance with the mining plan as referred to under sub-rule (1), the Regional Controller or the authorised officer may order suspension of all or any of the mining operations and permit continuance of only such operations as may be necessary to restore the conditions in the mine as envisaged under the said mining plan.

14. Prospecting and mining operations : - The prospecting and mining operations shall be carried out in such a manner so as to ensure systematic development of mineral deposits, conservation of minerals and protection of environment.

15. Open cast working : -

(1) In open cast workings the benches formed shall be so arranged that the benches in ore/mineral and overburden are separate so as to avoid mixing of waste with the ore/minerals.

(2) The benches in overburden shall be kept sufficiently in advance so that their workings do not interfere with the working of ore/minerals.

1 Inserted by

G.S.R. 55 (E), dated 17.1.2000. 2 Ibid.

(3) Orientation of the workings and sequence of mining operations shall be such that different grades of ore/ minerals can be obtained simultaneously for blending with a view to achieve optimum recovery of ore/minerals from the deposit.

16. Separate stacking of non-salable minerals : -

(1) The overburden and waste material obtained during mining operations shall not be allowed to be mixed with non-salable or subgrade minerals/ores. They shall be dumped and stacked separately on the ground earmarked for the purpose.

(2) The ground selected for dumping of overburden, waste material, the subgrade or non- salable ores/minerals shall be away from working pit. It shall be proved for absence or presence of underlying mineral deposits before it is brought into use for dumping.

(3) Before starting mining operations, the ultimate size of the pit shall be determined and the dumping ground shall be so selected that the dumping is not carried out within the limits of the ultimate size of the pit except in cases where concurrent back filling is proposed.

17. Underground mining operations : -

(1) Mining operations in underground shall be carried out in such a way so as to achieve

(2) The method of underground development of the deposit shall be planned in accordance with the method of stoping which shall be selected with due consideration of the geology of the deposit and geomechanical properties of the ore and the adjoining rocks.

(3) The size of development openings, size of blocks and pillars shall be such that the workings remain stable during the development and stoping stages and between such stages.

(4) The stoping practices shall be such as to cause minimum disturbance to the surface.

(5) In case of a doubt as to the optimum ore/mineral recovery under sub-rule (1), or the method of underground development under sub-rule (2), or size of openings, blocks or pillars under sub-rule (3) or the stoping practices under sub-rule (4), it shall be referred to the Chief Controller of Mines for decision.

(6) The Chief Controller of Mines may order such investigations and tests to be carried out as are considered necessary before arriving at a decision on any matter referred to him under sub-rule (5).

18. Subgrade minerals to be brought to surface :-

(1) All the subgrade ore/minerals wherever obtained in underground workings shall be brought to the surface instead of leaving or packing them in underground.

(2) As far as practicable the complete width of the ore/ mineral body shall be worked: Provided that the Chief Controller of Mines may permit in writing leaving of certain portions in underground if it is necessary for the support or protection to the mine workings.

19. Prohibition of reduction of blocks :- All the blocks formed in underground workings shall be regular in size and shape. Once a block is formed it shall not be split or reduced in size until the stage of commencement of stoping : Provided that the Chief Controller of Mines may permit reduction in the size of blocks on an application in writing made by the owner, agent, mining engineer or manager giving reasons for doing the same.

20. Beneficiation studies to be carried out :-

(1) If the Controller General or the authorised officer, having due regard to the nature of mining operations and grade of ore/mineral is of the view that the sub-grade ore/mineral contains certain recoverable product, he may direct the owner, agent, mining engineer or manager of the mine to get the beneficiation investigations carried out.

(2) The report of the beneficiation investigations so carried out shall be submitted to the Controller General or the authorised officer as the case may be immediately after the investigation is over.

(3) In a mine having a beneficiation plant, feed products and tailings shall be regularly sampled and analysed at suitable intervals and records of the same maintained in a bound paged book :

Provided that the Controller General or the authorised officer may require the sampling and analysis to be done at any other interval than in practice.

21. Machinery and plant :-

(1) Where heavy earth moving machinery is used in mines, the owner, agent, mining engineer or manager of the mine shall maintain Log Books in respect of each machine showing date-wise account of hours worked, hours not worked, reasons for non-working, consumption of fuel/energy and lubricants and output of the machine during the corresponding working hours. The summary of operation of each machine shall be recorded in the Log Book at the end of each month bringing out the percentage availability and percentage utilisation of the machine, average hourly performance and average fuel/energy consumption per hour.

(2) Each page of the Log Book shall be numbered and the summary shall be signed and dated by the mining engineer.

(3) The Log Book shall be made available to the authorised officer on demand.

22. Notice for opening of mine :-

(1) The owner, agent, mining engineer or manager of every mine shall send to the Controller General, Controller of Mines and the Regional Controller an intimation in Form-C of the opening of a mine so as to reach them within fifteen days of such opening.

(2) The intimation in Form-C sent to the Regional Controller under sub-rule (1) shall be accompanied with a copy of mining plan approved under clause(b) of sub-section(2) of section 5 of the Act only when the mine is being opened after a lapse of 5 years period from the date of approval of mining plan.

23. Abandonment of mines :-

(1) The owner, agent, mining engineer, or manager of every mine shall not abandon a mine or a part of mine during the subsistence of the lease except with prior permission in writing of the Controller General or the authorised officer.

(2) The owner, agent, mining engineer, or manager of every mine shall send to the Controller General, Controller of Mines and the Regional Controller under registered cover, a notice in Form-D of his intention to abandon a mine or a part of a mine so as to reach them at least ninety days before the intended date of such abandonment.

(3) Such a notice shall be accompanied by plans and sections on a scale of not less than 1cm = 10 metres setting forth accurately the work done in the mine up to the time of submission of the notice including the measures envisaged for the protection of the abandoned mine or part thereof, the approaches thereto, and the environment :

Provided that the Controller General may require the plans and sections to be prepared on any other suitable scale.

(4) The Controller General or the authorised officer may by an order in writing made before the proposed date of abandonment, prohibit abandonment or allow it to be done with such conditions as he may specify in the order.

1[(5) The leaseholder shall not abandon a mine or part thereof unless a final mine closure plan duly approved by the Regional Controller of Mines or the officer authorized by the State Government in this behalf, as the case may be, is implemented. For this purpose, the lessee shall be required to obtain a certificate from the Regional Controller of Mines or the officer authorized by the State Government in this behalf to the effect that protective, reclamation and rehabilitation work in accordance with the final mine closure plan or with such modifications as approved by the competent authority, have been carried out before abandonment of mine.] [23A. Mine Closure Plan.- Every mine shall have Mine Closure Plan, which shall be of two types:-

(i) a progressive mine closure plan; and

(ii) a final mine closure plan.

23B. Submission of Progressive Mine Closure Plan.- (1) The owner, agent, manager or mining engineer shall, in case of fresh grant or renewal of mining lease, submit a progressive mine closure plan as a component of mining plan to the Regional Controller of Mines or officer authorized by the State Government in this behalf as the case may be.

(2) The owner, agent, manager or mining engineer shall, in case of existing mining lease submit a progressive mine closure plan to the Regional Controller of Mines or the officer authorized by the State Government in this behalf, as the case may be, for approval [on or before the 31 st December, 2004].

(3) The owner, agent, manager or mining engineer shall review the progressive mine closure plan every five years from the date of its approval in case of existing mine or from the date of opening of the mine in case of fresh grant or from the date of renewal of mining lease, as the case may be, and shall submit to the Regional Controller of Mines or officer authorised by the State Government in this behalf, as the case may be, for its approval.

(4) The Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, shall convey his approval or refusal of the progressive mine closure plan within ninety days of the date of its receipt.

(5) If approval or refusal of the progressive mine closure plan is not conveyed to the owner, agent, manager or mining engineer of the mining lease within the period as specified in sub-rule (4), the progressive mine closure plan shall be deemed to have been provisionally approved, and such approval shall be subject to final decision whenever communicated. 23C. Submission of final mine closure plan.- (1) The owner, agent, manager or mining engineer shall submit a final mine closure plan to Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, for approval one year prior to the proposed closure of the mine.

(2) The Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, shall convey his approval or refusal of the final mine closure plan within ninety days of the date of its receipt to the owner, agent, manager or mining engineer.

(3) If approval or refusal of the final mine closure plan is not conveyed to the owner, agent, manager or mining engineer of the mining lease within the period as specified in sub rule (2), the final mine closure plan shall be deemed to have been provisionally approved, and such approval shall be subject to final decision whenever communicated. 23D. The modification of mine closure plan.- (1) The holder of a mining lease desirous of seeking modifications in the approved mine closure plan, shall submit to the Controller General or the officer authorised by the State Government in this behalf, as the case may be, for approval setting forth the intended modifications and explaining the reasons for such modifications.

(2) The Controller General or the officer authorised by the State Government in this behalf, as the case may be, may approve the modifications as submitted under clause (1) or approve with such alterations as he may consider expedient.

23E. Responsibility of the holder of mining lease.- (1) The owner, agent, manager or mining engineer shall have the responsibility to ensure that the protective measures contained in the mine closure plan referred to in this rule including reclamation and rehabilitation works have been carried out in accordance with the approved mine closure plan or with such modifications as approved by the Regional Controller or the officer authorised by the State Government in this behalf under this rule.

(2) The owner, agent, manager or mining engineer shall submit to the Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, a yearly report before 1st July of every year setting forth the extent of protective and rehabilitative works carried out as envisaged in the approved mine closure plan, and if there is any deviation, reasons thereof.

23F. Financial assurance.- (1) Financial assurance, has to be furnished by every leaseholder. The amount of financial assurance shall be rupees twenty five thousand for A category mines and rupees fifteen thousand for B category mines, per hectare of the mining lease area put to use for mining and allied activities. However, the minimum amount of financial assurance to be furnished in any of the forms referred to in clause (2) shall be rupees two lakh for A category mines and rupees one lakh for B category mines.

Provided that a leaseholder shall be required to enhance the amount of financial assurance with the increase in the area of mining and allied activities: Provided further that where a leaseholder undertakes reclamation and rehabilitation measures as part of the progressive closure of mine, the amount so spent shall be reckoned as sum of the financial assurance already spent by the leaseholder and the total amount of financial assurance, to be furnished by the lessee, shall be reduced to that extent;

(2) The financial assurance shall be submitted in one of the following forms to Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, or any amendment to it :

(a) Letter of Credit from any Scheduled Bank;

(b) Performance or surety bond;

(c) Trust fund build up through annual contributions from the revenue generated by mine and based on expected amount sum required for abandonment of mine; or

(d) Any other form of security or any other guarantees acceptable to the authority;

(3) The lessee shall submit the financial assurance to the Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, before executing the mining lease deeds. In case of an existing mining lease, the lessee shall submit the financial assurance along with the progressive mine closure plan.

(4) Release of financial assurance shall be effective upon the notice given by the lessee for the satisfactory compliance of the provisions contained in the mine closure plan and certified by the Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be.

(5) If the Regional Controller of Mines or the officer authorised by the State Government in this behalf, has reasonable grounds for believing that the protective, reclamation and rehabilitation measures as envisaged in the approved mine closure plan in respect of which financial assurance was given has not been or will not be carried out in accordance with the mine closure plan, either fully or partially, the Regional Controller of mines or the officer authorised by the State Government in this behalf, shall give the lessee a written notice of his intention to issue the orders for forfeiting the sum assured atleast thirty days prior to the date of the order to be issued.

(6) Within thirty days of the receipt of notice referred to in sub-rule(5), if no satisfactory reply has been received in writing from the lessee, the Regional Controller of Mines or the officer authorised by the State Government in this behalf as the case may be, shall pass an order for forfeiting the surety amount and a copy of such order shall be endorsed to the concerned State Government.

(7) Upon the issuance of order by the Regional Controller of Mines or the officer authorised by the State Government in this behalf, as the case may be, the concerned State Government may realise any letter of credit or bond or any other surety, guarantee provided or obtained as financial assurance for the purpose of performance of protective, reclamation, rehabilitation measures and shall carry out those measures, or appoint an agent to do so.] [24. Notice of temporary discontinuance of work in mines and obligations of the lease holders. –

(1) The owner, agent, mining engineer or manager of every mine shall send to Controller General, Controller of Mines and the Regional Controller of Mines a notice in Form D-1 when the mining or mineral processing operations in the mine or part thereof are discontinued for a period exceeding ninety days so as to reach them within one hundred and five days from the date of such temporary discontinuance.

(2) Where the discontinuance takes place as a result of the occurrence of natural calamity beyond the control of the owner, agent, mining engineer or manager of a mine, or in compliance with any order or directions issued by any statutory authority established under any law in force or any tribunal or a court, a telegraphic intimation shall be sent to the Controller General and the Regional Controller within a period of twenty-four hours of such discontinuance, and a notice of discontinuance, under this sub rule shall be submitted to the Controller General, Controller of Mines and the Regional Controller within a period of fifteen days of such discontinuance in Form D-1.

(3) During the temporary discontinuation of mine or part thereof, it shall be the responsibility of the owner, agent, manager or mining engineer to comply with the reasonable prohibitive measures to restrict access for unauthorised entry, provide protective measures to potentially danger sources of electrical and mechanical installations, the mine openings or workings and all other structures. It shall be ensured that all contaminated effluents are controlled and all physical, chemical, biological monitoring programmes have been continued. It shall also be ensured that all rock piles, over burden piles and stock piles and tailings and other water impoundment structure have been maintained in stable and safe conditions.]

25. Intimation of reopening of a mine :- The owner, agent, mining engineer or manager of every mine shall send to the Controller General, Controller of Mines and the Regional Controller an intimation in Form-C of reopening of a mine after temporary discontinuance, so as to reach them within fifteen days from the date of such reopening.

26. Stoping of vein, etc. :- (1) No stoping shall be commenced, conducted or carried out except with prior permission in writing of the Controller General, or the authorised officer.

(2) The owner, agent, mining engineer or manager of every mine shall send to the Controller General, Controller of Mines and the Regional Controller under registered cover a notice in Form-E intimating his intention to commence the stoping of any vein, lode, reef or mineral deposit, so as to reach them at least sixty days before the date of commencement of such operations.

(3) Such notice shall be accompanied by plans and sections on a scale of not less than 1 cm = 10 metres showing the details of the block proposed to be stoped, the manner of stoping, the mineralised and barren zones indicating estimated percentages recovery from stopes : Provided that the Controller General [or the Chief Controller of Mines, as the case may be,] may, by an order in writing and subject to such conditions as he may specify therein, permit or require the plans and sections to be prepared on any other suitable scale.

(4) The Controller General or the authorised officer may by an order in writing made before the proposed date of commencement of stoping operations prohibit the stoping or allow it to be done under such conditions as may be specified in the order. CHAPTER – IV Plans and Sections

27. General requirements about plans and sections :-

(1) Every plan or section prepared or submitted in accordance with the provisions of these rules shall -

(a) show the name of the mine and of the owner and the purpose for which the plan or section is prepared;

(b) show the true north or the magnetic meridian and the date of the latter;

(c) show a scale of the plan at least twenty five centimetres long and suitably sub- divided;

(d) unless otherwise provided, be on a scale having a representative factor of –

(i) 200 : 1 in case of mica mines and other mines having small-scale workings below ground;

(ii) 2000 : 1 in case of mines having large open cast working and also in case of surface plans of large leasehold areas; and

(iii) 1000 : 1 in other cases:

Provided that the Chief Controller of Mines may, by an order in writing and subject to such conditions as he may specify therein, permit or require the plans to be prepared on any other suitable scale;

(e) be properly inked in on a durable paper or on tracing cloth or other suitable material and be kept in good condition.

(2) The conventions prescribed under the Metalliferous Mines Regulations, 1961, shall be used in preparing all plans and sections required under these rules.

(3) The plans and sections shall be accurate within such limits of error as the Controller General may specify by a general or special order.

[(4) The plans and sections required under these rules shall be maintained up to date within three months in case of category ‘A’ mines as referred to in clause (b) of sub-rule (1) of rule 42, and within twelve months in the case of any other mine.]

28. Types of plans and sections :-

(1) The owner, agent, mining engineer or manager of every mine shall keep the following plans and sections -

(a) a surface plan showing every surface feature within the mining lease boundaries, such as building, telephone, telegraph or power transmission line, watermain, tramline, railway, road, river, water-course, reservoir, tank, bore-hole, shaft and incline opening, opencast working, dumps and dumping ground, the waste land, forest, sanctuaries, agricultural land and grazing land and subsidence on the surface;

(b) a surface geological plan of the area of leasehold, on a scale specified or approved by the Controller General by a general or special order in writing showing-

(i) all the lithological units exposed in the area, in the pits, trenches and in any other openings made for prospecting and mining operations showing contact between lithological units;

(ii) structural details like strike, dip, fold, fault, plunge of ore body;

(iii) location of prospecting pits, trenches, boreholes and any other openings made for prospecting and/or mining operations;

(iv) existing mine workings, dumps.

(c) a transverse section or sections of the workings through the shaft or shafts and main adits indicating clearly the strike and dip of the vein, lode, reef, or mineral bed or deposit at different points, and such sections of the strata sunk or driven through in the mine or proved by boring, as may be available;

(d) a longitudinal mine section or sections showing a vertical projection of the mine workings including outlines of all stoped out areas, where a reef, vein, lode or mineral bed/deposit or part thereof has dip exceeding thirty degrees from the horizontal plane :

Provided that, with the permission in writing of the Controller General [or the Chief Controller of Mines, as the case may be,] and subject to such conditions as he may specify therein, such sections may be prepared in relation to any other suitable plane.

(e) an underground plan showing -

(i) the position of the workings of the mine below ground;

(ii) every borehole and shaft (with depth), drive, cross-cut, winze, raise, excavation (stoped ground) and every tunnel and air passage connected therewith;

(iii) every pillar or block of mineral left for the support of any structure on the surface; and underground magazines, if any;

(iv) the general strike of the veins, lodes, reefs and mineral beds or deposits;

(v) the position of every dyke, fault and other geological disturbance with the amount and direction of throw.

(2) Whenever the underground plan referred to in clause (e) of sub-rule (1) is brought up- to-date, the then position of the workings shall be shown by a dotted line drawn through the ends of the workings, and such dotted line shall be marked with the date of the last survey : Provided that the Controller General [or the Chief Controller of Mines, as the case may be,] may, by an order in writing and subject to such conditions as he may specify therein approve any other method of showing the up-to-date position of the workings of the mine.

(3) Where different reefs, lodes, veins or mineral beds or deposits overlie or run parallel to one another, the workings of each reef, lode, vein or mineral bed or deposit shall be shown on separate plan and/or longitudinal section or sections; however if two reefs, lodes, veins or mineral beds or deposits are so situated in relation to each other that the parting between workings made therein is less than ten metres at any place, such workings shall also be shown on a combined plan and/or longitudinal section, as the case may be, in different colours.

(4) The plans kept under clauses (a) and (e) of sub-rule (1) shall also show the settled boundary of the mining lease, or where the boundary is in dispute, the boundaries claimed by the owner of the mine and by the owners of the mines adjacent to the disputed boundary : Provided that where it is not possible to show the complete boundary of leasehold on the same plan an additional key plan on any other suitable scale showing such boundaries and the outline of the workings shall also be maintained.

(5) The owner, agent, mining engineer or manager of every mine shall keep the following :

(a) A key plan on a scale of 1: 63,000 or 1: 50,000 incorporating the following :

(i) 2 [An administrative surface map showing the boundary of the mining lease, and the adjoining area lying preferably within five kilometres thereof;]

(ii) Contours at not more than [twenty] metres intervals;

(iii) Natural drainage system such as rivers, streams, nalahs, water reservoirs, ponds, lakes, irrigation dams and canals;

(iv) Roadways and railways;

(v) Places of historical and archaeological importance, monuments, places of worship, pilgrimage and of tourist interest;

(vi) Forests with tree density, sanctuaries, wastelands, agricultural lands, grazing lands;

(vii) Boundaries of all villages and towns with their population;

(viii) Predominant wind direction;

(ix) Any other relevant features.

Provided that where topographical map is classified as restricted, the particulars referred to in items (i) to (ix) shall be incorporated in the key plan to the extent available in the administrative [surface] maps.

(b) An environment plan of the area of mining lease inclusive of the adjoining area within five hundred metres of the boundary of a lease area on 1 : 5000 scale incorporating the following :

(i) [An administrative surface map showing the boundary of the mining lease;]

(ii) Contour lines at five metres intervals;

(iii) All features indicated in sub-clauses (iii) to (ix) of clause (a) above;

(iv) Area occupied by mine workings, area deforested, area covered by dump with the height of the dump, processing plant, surface building, workshop, mining township;

(v) Area reclaimed and area afforested, location of protective barriers, check dams erected to contain solid and liquid effluents generated by prospecting, mining, beneficiation or metallurgical operations carried out in the mine;

(vi) All pumping stations and the courses of discharge of mine water. Provided that the particulars with regard to items (ii), (iv) and (v) shall be applicable only upto sixty metres beyond the boundary of lease area.

(6) (a) The Controller General may, by an order in writing, require such additional details to be shown on the plans and sections required to be kept under these rules or the preparation and maintenance of such plans and sections showing such details and on such scale and within such time as he may specify in the order.

(b) The Controller General or the authorised officer may, by an order in writing, require the owner, agent, mining engineer or manager of a mine to submit to him within such time, such plans and sections, or tracings thereof, as he may specify in the order.

29. Copies of plans and sections to be submitted :- The owner, agent, mining engineer or manager of every mine shall, [on or before the 30 th day of June] every year submit to the Controller General, Controller of Mines and the Regional Controller a copy of the plans and sections maintained under rule 28.

30. Preparation of plans :-

(1) All plans, sections and tracings or copies thereof kept at the mine shall be serially numbered or suitably indexed.

(2) Every plan, section or part thereof prepared under these rules shall carry thereon a certificate for its correctness and shall be signed by the mining engineer with date : Provided that the geological plans and sections shall be certified and signed by the geologist employed under rule 42.

(3) Every copy of a plan and section or part thereof submitted or maintained under these rules shall bear a reference to the original plan or section from which it was copied and shall be certified thereon by the owner, agent, mining engineer or manager to be a true copy of the original plan or section.

CHAPTER – V Environment

31. Protection of environment :- Every holder of a prospecting licence or a mining lease shall take all possible precautions for the protection of environment and control of pollution while conducting prospecting, mining, beneficiation or metallurgical operations in the area.

32. Removal and utilisation of top soil :-

(1) Every holder of a prospecting licence or a mining lease shall, wherever top soil exists and is to be excavated for prospecting or mining operations, remove it separately.

(2) The top soil so removed shall be utilised for restoration or rehabilitation of the land which is no longer required for prospecting or mining operations or for stabilising or landscaping the external dumps.

(3) Whenever the top soil cannot be utilised concurrently, it shall be stored separately for future use.

33. Storage of overburden, waste rock, etc. :-

(1) Every holder of a prospecting licence or a mining lease shall take steps so that the overburden, waste rock, rejects and fines generated during prospecting and mining operations or tailings, slimes and fines produced during sizing, sorting and beneficiation or metallurgical operations shall be stored in separate dumps.

(2) The dumps shall be properly secured to prevent escape of material therefrom in harmful quantities which may cause degradation of environment and to prevent causation of floods.

(3) The site for dumps, tailings or slimes shall be selected as far as possible on impervious ground to ensure minimum leaching effects due to precipitations.

(4) Wherever possible, the waste rock, overburden, etc. shall be back-filled into the mine excavations with a view to restoring the land to its original use as far as possible.

(5) Wherever back-filling of waste rock in the area excavated during mining operations is not feasible, the waste dumps shall be suitably terraced and stabilised through vegetation or otherwise.

(6) The fines, rejects or tailings from mine, beneficiation or metallurgical plants shall be deposited and disposed in a specially prepared tailings disposal area such that they are not allowed to flow away and cause land degradation or damage to agricultural field, pollution of surface water bodies and ground water or cause floods.

34. Reclamation and rehabilitation of lands :- Every holder of prospecting licence or mining lease shall undertake the phased restoration, reclamation and rehabilitation of lands affected by prospecting or mining operations and shall complete this work before the conclusion of such operations and the abandonment of prospect or mine.

35. Precaution against ground vibrations :- Whenever any damage to public buildings or monuments is apprehended due to their proximity to the mining lease area, scientific investigations shall be carried out by the holder of mining lease so as to keep the ground vibrations caused by blasting operations within safe limit.

36. Control of surface subsidence :- Stoping in underground mines shall be so carried out as to keep surface subsidence under control.

37. Precaution against air pollution :- Air pollution due to fines, dust, smoke or gaseous emissions during prospecting, mining, beneficiation or metallurgical operations and related activities shall be controlled and kept within 'Permissible Limits' specified under various environmental laws of the country including the Air (Prevention and Control of Pollution) Act, 1981 (14 of 1981) and the Environment (Protection) Act, 1986 (29 of 1986) by the holder of prospecting licence or a mining lease.

38. Discharge of toxic liquid :- Every holder of prospecting licence or a mining lease shall take all possible precautions to prevent or reduce the discharge of toxic and objectionable liquid effluents from mine, workshop, beneficiation or metallurgical plants, tailing ponds, into surface water bodies, ground water aquifer and useable lands, to a minimum. These effluents shall be suitably treated, if required, to conform to the standards laid down in this regard.

39. Precaution against noise :- Noise arising out of prospecting, mining, beneficiation or metallurgical operations shall be abated or controlled by the holder of prospecting licence or a mining lease at the source so as to keep it within the permissible limit.

40. Permissible limits and standards :- The standards and permissible limits of all pollutants, toxins and noise referred to in rules 37, 38 and 39 shall be those notified by the concerned authorities under the provisions of the relevant statutes from time to time.

41. Restoration of flora :-

(1) Every holder of prospecting licence or a mining lease shall carry out prospecting or mining operations, as the case may be, in such a manner so as to cause least damage to the flora of the area held under prospecting licence or mining lease and the nearby areas.

(2) Every holder of prospecting licence or a mining lease shall -

(a) take immediate measures for planting in the same area or any other area selected by the Controller General or the authorised officer not less than twice the number of trees destroyed by reason of any prospecting or mining operations;

(b) look after them during the subsistence of the licence/lease after which these trees shall be handed over to the State Forest Department or any other authority as may be nominated by the Controller General or the authorised officer; and

(c) restore, to the extent possible, other flora destroyed by prospecting or mining operations.

CHAPTER – VI Employment of Qualified persons [42. Employment of geologists and mining engineer

(1) For the purpose of carrying out reconnaissance, prospecting or mining operations in accordance with these rules:

(a) Every holder of reconnaissance permit shall employ a whole-time geologist;

(b) Every holder of prospecting licence shall employ a whole-time geologist and mining engineer;

(c) every holder of a mining lease shall employ, in case of:-

(i) category 'A' mines, a whole-time mining engineer and geologist;

(ii) category 'B' mines, a part-time mining engineer and a part-time geologist: Provided that in the case of fully mechanized category 'A' mines, the mining engineers and geologists shall have minimum ten years of professional experience of working in a supervisory capacity in the field of mining:

Provided further that in case of category 'B' mines, a person employed in terms of the provisions of sub-rule (6) may be permitted to be employed in lieu of part-time mining engineer.

(2) For the purpose of this rule -

(i) category 'A' mines means

(a) such fully mechanized mines where the work is being carried out by deployment of heavy mining machinery for deep hole drilling, excavation, loading and transport, or

(b) such mines where the number of average employment exceeds one hundred and fifty in all or seventyfive workings below ground, or mines where any of the mining operations like deep hole drilling, excavation, loading and transport is carried out with the help of heavy machinery.

(ii) category 'B' mines means mines other than category 'A' mines: Provided that if any doubt arises as to whether any mine is a category 'A' mine, it shall be referred to the Controller General, Indian Bureau of Mines for decision. Explanation : The expression 'average employment' means the average per day of the total employment of the mine during the preceding quarter (obtained by dividing the number of man days worked by the number of working days).

3) The part-time mining engineer and geologist can be employed up to a maximum of six prospects or mines, provided that all such prospects or mines are located within a radius of 50 kilometres.

(4) If the holder of a reconnaissance permit, prospecting licence or a mining lease is a geologist or mining engineer, he may appoint himself as the geologist or mining engineer for the purpose of sub-rule (1).

(5) A mining engineer or geologist employed by the holder of a prospecting licence or mining lease shall possess the qualifications specified below:- Geologist : A postgraduate degree in Geology granted by a University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification. Mining Engineer : A degree in Mining Engineering granted by a University established or incorporated by or under a Central Act, a Provincial Act or a State Act, including any institution recognized by the University Grants Commission established under section 4 of the University Grants Commission Act, 1956 or any equivalent qualification.

(6) (a) Any person possessing the qualification and experience for the category of mines as laid down in the Table below shall be eligible to be employed in lieu of part-time mining engineers in respect of the category of mines specified.

TABLE

Qualifications Experience Category of Mines

(i) Diploma in Mining or Post- graduate Degree in Geology with First Class Metalliferous Mine Manager's Certificate Nil Category 'B' Mines

(ii) Holder of First Class Metalliferous Mine Manager’s Certificate Two years experience after obtaining the Certificate (iii)Diploma in Mining or Post- graduate Degree in Geology or equivalent 3 years experience in supervisory capacity in mine Qualifications Experience Category of Mines

(iv) Graduate in Geology or holder of Second Class Metalliferous Mine Manager's Certificate 5 years experience after graduation or one year’s experience after obtaining the Certificate v) Secondary School Leaving Certificate with Mines Foreman’s Certificate.

5 years experience as a Mine Foreman/Mate All open cast mines of Category 'B'

(b) The person permitted to be employed in lieu of mining engineer shall be bound by these rules in the same way as the mining engineer.

(7) Where, due to reduction in average employment in the mine, a category 'A' mines qualifies to become a category 'B' mines, the employment of a mining engineer as required for category 'B' mines may be done only with previous permission in writing of the Controller General or the authorised officer and subject to such conditions as he may specify”].

43. Duties of geologist :-

(1) It shall be the duty of the geologist to conduct prospecting operations in accordance with the provisions of these rules.

(2) He shall -

(a) prepare the necessary geological plans and sections which are required to delineate the ore body;

(b) calculate ore reserves and its grade;

(c) be responsible for providing all the necessary information required for controlling the quality of the minerals produced;

(d) maintain proper records of the prospecting operations and records of sinking of shafts and boreholes as provided under these rules;

(e) work out the appropriate method of sampling and ensure preparation of samples accordingly;

(f) maintain an assay plan in cases of underground workings;

(g) maintain all technical data for determining the shape and size of each stope block;

(h) update the reserve figures, grade-wise and category-wise at the end of every year in case of a working mine;

(i) identify the associated rocks and minerals and maintain proper records of the stacks of non-salable/sub-grade ores and minerals produced;

(j) carry out all such orders and directions as may be given in writing under these rules by the Controller General or the authorised officer and shall forward a copy of all such orders or directions to the holder of the prospecting licence or, as the case may be, the mining lease.

44. Duties of mining engineer :-

(1) It shall be the duty of the mining engineer to take all necessary steps to plan and conduct mining operations, so as to ensure conservation of minerals, systematic development of the mineral deposits and protection of environment in and around the mining lease area in accordance with these rules.

(2) He shall be responsible for the preparation and maintenance of plans, sections, reports and schemes in accordance with these rules.

(3) He shall be responsible for carrying out the study of the associated rocks and minerals, identifying them and stacking the various minerals produced separately.

(4) He shall carry out all such orders and directions as may be given in writing under these rules by the Controller General or the authorised officer and shall forward a copy of such orders or directions to the holder of prospecting licence or, as the case may be, the mining lease.

(5) Wherever the mining engineer is appointed to supervise the prospecting operations under rule 42, he shall also carry out the duties of the geologist.

(6) (a) The mining engineer shall ensure that there is sufficient provision of proper materials, appliances and facilities at all times at the mine for the purpose of carrying out the provisions of these rules and orders issued thereunder and where he is not the owner or agent of the mine, he shall make requisition in writing to the owner or agent for anything required for the aforesaid purpose. A copy of every such requisition shall be recorded in a bound paged book kept for the purpose.

(b) On receipt of a requisition under clause (a), the owner or agent shall provide as soon as possible the materials and facilities requisitioned by the mining engineer. CHAPTER – VII Notices and Returns [“45. Monthly and annual returns-(1) The owner, agent, mining engineer or manager of every mine, or any person or company engaged in trading or storage or end-use or export of minerals mined in the country, shall cause himself to be registered with the Indian Bureau of Mines as per application specified in Form M and the registration number so allotted by the Indian Bureau of Mines shall be used for all purposes of reporting and correspondence connected therewith.

(2) For the purpose of registration under sub-rule (1), the owner, agent, mining engineer or manager of every mine, or any person or company engaged in trading or storage or end-use or export of minerals, shall apply for registration within one month from the date of commencement of these rules.

(3) The Indian Bureau of Mines shall allot and record the registration number in a register containing the details on a consecutive identity number (in numeric form), followed by letters ‘M’ and ‘T’, for a mine or a person or company engaged in trading or storage or end-use or export of minerals, as the case may be, the year of registration and the name of State.

(4) The Indian Bureau of Mines shall maintain a register giving details of the owner, agent, mining engineer or manager of every mine, or any person or company engaged in trading or storage or end-use or export of minerals, as the case may be, as registered under the provisions of these rules, which shall be made available to the general public for inspection on demand, and also posted on the website of the Indian Bureau of Mines.

(5) The owner, agent, mining engineer or manager of every mine, shall submit to the Regional Controller of Mines in the Indian Bureau of Mines or any other authorised official of the Indian Bureau of Mines, returns in respect of each mine, in the following manner, namely:- (a ) a monthly return which shall be submitted before the 10th of every month in respect of preceding month in the Form as indicated below:-

(i) for iron ore in Form F-1;

(ii) for manganese ore in Form F-2;

(iii) for [bauxite and laterite] in Form F-3;

(iv) for chromite in Form F-4;

(v) for copper, lead, zinc, pyrites, gold, tin and tungsten in Form F-5;

(vi) for mica in Form F-6

(vii) for precious and semi-precious stones in Form F-7;

(viii) for all other minerals in Form F-8;

(b) an annual return which shall be submitted before the 1st July each year for the preceding financial year in the Form as indicated below:-

(i) for iron ore in Form H-1;

(ii) for manganese ore in Form H-2;

(iii) for [bauxite and laterite] in Form H-3;

(iv) for chromite in Form H-4;

(v) for copper, lead, zinc, pyrite, gold, tin and tungsten in Form H-5;

(vi) for mica in Form H-6;

(vii) for precious and semi-precious stones in Form H-7;

(viii) for all other minerals in Form H-8:

Provided that in the case of abandonment of a mine, the annual return shall be submitted within one hundred and five days from the date of abandonment.

(6) Any person or company engaged in trading or storage or end-use or export of minerals, shall submit to the Indian Bureau of Mines and concerned State Government, where the said person or company is sourcing the minerals, the returns in the following manner, namely:-

(i) a monthly return which shall be submitted before the 10th of every month in respect of preceding month in Form N;

(ii) an annual return which shall be submitted before the 1st July each year for the preceding financial year in the Form O.

(7) If it is found that the owner, agent, mining engineer or manager of mine or the person or company engaged in trading or storage or end-use or export of minerals, as the case may be, has submitted incomplete or wrong or false information in monthly or special or annual returns or fails to submit a return within the date specified, -

(i) in the case of mining of minerals by the owner, agent, mining engineer or manager of mine, then the Regional Controller of Mines may,-

(a) order suspension of all mining operations in the mine and may revoke the order of suspension only after ensuring proper compliance;

(b) take action to initiate prosecution under these rules;

(c) recommend termination of the mining lease, in case such suppression or misrepresentation of information indicates abetment or connivance of illegal mining;

(ii) in the case of trading or storage or end-use or export of minerals, the State Government, where the person or company engaged in trading or storage or end-use or export of minerals is sourcing the minerals, shall order suspension of, -

(a) trading licence (by whatever name it is called);

(b) all transportation permits issued to such person or company for mineral transportation (by whatever name it is called);

(c) storage licence for stocking minerals (by whatever name it is called);

(d) permits for end-use industry or carrying out export of minerals (by whatever name it is called);

as the case may be, of such person or company engaged in trading or storage or end-use or export of minerals, and may revoke the order of suspension only after ensuring proper compliance.

(8) In case of mining of minerals by the owner, agent, mining engineer or manager of mine, the ex-Mine price of mineral shall be,-

(a) where export has occurred, free-on-board (F.O.B) price of the mineral, less deductions specified below:

(i) loading charges by the miner;

(ii) transportation charges from the mine site to the rail head or port, including railway freight;

(iii) unloading and loading charges at the rail-head or domestic end- use capacity or port;

(iv) charges for sampling and analysis of ore grade;

(v) rent for the plot at the stocking yard in railway siding or port;

(vi) handling charges in port;

(vii) charges for stevedoring and trimming;

(viii) any other incidental charges levied outside the mine-site as notified by the Indian Bureau of Mines from time-to-time.

(b) where domestic sale of mineral has occurred, sale price of mineral recorded in the invoice less the actual expenditure incurred towards loading, unloading, transportation and other charges beyond mine site: Provided that in case a sale has occurred-

(i) between any persons or associations of persons or companies and where the seller has a substantial interest in the association of persons or company buying the mineral or where the buyer has a substantial interest in the association of persons or company selling the mineral;

(ii) for the purposes of use of mineral in a end-use industry for which the mine is a captive supplier, then such sale shall not be recognised as a sale for the purpose of this rule and in such case, clause (c) of this sub- rule shall be applicable.

Explanation- For the purpose of this sub-rule, the expression “substantial interest in the association of persons or company buying or selling the mineral, as the case may be”, shall mean,-

(i) a person who is member of the management board of the association or company or is entitled or eligible to a share in the profits of the association or company buying or selling the minerals, as the case may be, to an extent exceeding ten percent. of the distributed profit;

(ii) an association of persons or company, when such association of persons or company is entitled or eligible to a share in the profits of the association or company buying or selling the minerals, as the case may be, to an extent exceeding ten percent. of the distributed profits.

(c) where the sale has not occurred, the average sale price published monthly by the Indian Bureau of Mines for a particular mineral for a particular State shall be taken as the ex-mine price of the mineral for the purposes of reporting: Provided that if for a particular mineral, the information for a State for a particular month is not published by the Indian Bureau of Mines, the last available information published for that mineral for that particular State by the Indian Bureau of Mines previous to the reporting month shall be referred, failing which the latest information for All India for the mineral shall be referred.

(9) In case of trading or storage or end-use or export of minerals, for purpose of filing of returns, the sale price per unit of the mineral shall be,-

(a) where sale of mineral has occurred, sale price of mineral recorded in the invoice in case of domestic sale, or the Free-on-Board (F.O.B) or Cost insurance and Freight (C.I.F) price of minerals,

(b) where sale has not occurred, the average sale price published monthly by the Indian Bureau of Mines for a particular mineral for a particular State shall be taken as the sale price of the mineral for the purpose of reporting:

Provided that if for a particular mineral, the information for a State for a particular month is not published by the Indian Bureau of Mines, the last available information published for that mineral for that particular State by the Indian Bureau of Mines previous to the reporting month shall be referred, failing which the latest information for All India for the mineral shall be referred.

(10) If more than one mineral is produced from the same mine, return shall be submitted in specified forms for each mineral separately.

(11) In case of temporary discontinuance of mining or suspension of mining, or temporary discontinuance or suspension of trading or storage or end-use or export of minerals, the owner, agent, mining engineer or manager of mine, or the person or company engaged in trading or storage or end-use or export of minerals, as the case may be, shall submit return in the specified form for the mineral for which return had been submitted earlier, furnishing relevant particulars, inclusive of “Nil” information.

(12) In case ownership of the mine or the trading or storage or end-use or export company changes during the reference period, separate returns have to be filled by each owner for the respective periods of ownership.

(13) For the purpose of regulation of transportation of minerals, all persons and companies owning trucks or any other motorised vehicle used for transportation of mineral by road or through water way shall be required to be registered with the Directorate of Mining and Geology or the Department handling mining matters in the State Government and the lessee shall maintain trip-sheets (either in the form of written record or on computers) of the vehicles, the nature and weight of mineral and the approximate time of the trip and its destination”.]

46. Notice of certain appointments :- When any new appointment is made of an agent, mining engineer, geologist, manager or any person under sub-rule (6) of rule 42 or when the employment of any such person is terminated or any such person leaves the said employment or when any change occurs in the address of any such person, the owner of the mine or the holder of the prospecting licence shall within fifteen days from the date of such appointment, termination, leaving or change in address give a notice in Form I to the Controller General, Controller of Mines and the Regional Controller.

47. Notice of shaft sinking and boreholes :- The owner, agent, mining engineer, geologist or manager of every mine or the holder of a prospecting licence shall send intimation in Form J to the Controller General, Controller of Mines and the Regional Controller within fifteen days after the commencement of any of the following operations:

(a) the sinking of trial shaft or borehole to a depth exceeding ten metres from the surface, or

(b) the extension of an existing shaft or borehole to a depth exceeding ten metres, or

(c) the sinking of a new shaft or boreholes commencing from underground workings: Provided that the Controller General or the authorised officer may permit such intimation to be given collectively within such extended period as may be specified by him.

48. Records of shafts and boreholes :- The owner, agent, mining engineer, geologist or manager of every mine or the holder of a prospecting licence shall keep a record in Form-K of all shafts or boreholes exceeding ten metres in depth and shall retain all records and sample of the strata passed through for a period of not less than twelve months after the completion of the work or abandonment thereof :

Provided that the records of boreholes and shafts exceeding one hundred metres length shall not be destroyed except with the prior approval of the Controller General or the Regional Controller.

49. Change in the name of mine to be notified :- The owner, agent, mining engineer or manager of every mine shall send a notice in Form-C to the Controller General, the Controller of Mines and the Regional Controller, of any change in the name of the mine within thirty days of such change.

50. Notice of transfer of prospecting licence or mining lease :- Without prejudice to the provisions of the Act or any rules made thereunder or the terms and conditions of a prospecting licence or a mining lease, prohibiting or restricting the transfer of a prospecting licence or a mining lease, every holder of a prospecting licence or a mining lease who transfers or assigns his licence or lease or any right, title or interest thereunder to any other person, shall, within thirty days of the date of such transfer or assignment send an intimation thereof in Form-L to the Controller General, the Controller of Mines and the Regional Controller. [50A. Notice of amalgamation of mining lease :- Without prejudice to the provisions of the Act or any rules made thereunder or the terms and conditions of a mining lease, every holder of a mining lease shall within thirty days of the date of amalgamation of mining leases carried out under rule 38 of Mineral Concession Rules, 1960, send an intimation thereof to the Controller General and the State Government.]

51. Transfer of records to transferees :- When the ownership of a prospecting licence or a mining lease is transferred, the previous owner or his agent shall make over to the new owner or his agent within a period of seven days of the transfer of the ownership, borehole cores preserved, if any, all plans, sections, reports, registers and other records maintained in pursuance of the Act, Rules or Orders made thereunder, and all correspondence relevant thereto relating to the prospecting licence or mining lease; and when the requirements of these rules have been duly complied with, both previous and the new owners or their respective agents shall forthwith send to the Controller General, Controller of Mines and the Regional Controller a detailed list of borehole cores, plans, sections, reports, registers and other records that have been transferred.

52. Copies of notices/returns to be submitted to the State Government :- The owner, agent, mining engineer or manager of every mine or a holder of a prospecting licence shall simultaneously submit a copy each of the notice/return/intimation required to be submitted under these rules to the State Government concerned in whose territory the mine or the prospecting area is situated or to such authority as that Government may specify in this behalf.

53. Copies of notices and returns to be maintained :- The owner, agent, mining engineer or manager of every mine or a holder of a prospecting licence shall maintain the labour attendance register, production and despatch register, explosives consumption register, mineral analysis reports and details of mining machinery and copies of all notices and returns, plans, sections and schemes submitted to the Controller General under these rules, at an office established in the area where mining or prospecting operations are carried on, and these shall be made available at all reasonable times to the officers of the Indian Bureau of Mines for inspection.

CHAPTER – VIII Examination of Minerals and Issue of Directives

54. Power to issue directions :-

(1) The owner, agent, mining engineer, geologist or manager of every mine shall comply with such directions being directions for purposes of providing for systematic development of mineral deposits, conservation of minerals and for the protection of the environment by preventing or controlling pollution which may be caused by prospecting, mining, beneficiation or metallurgical operations, as the Controller General may issue from time to time. A copy of the proposed directions to be issued to any particular mine will be sent by the Controller General to the owner, agent, mining engineer, geologist or manager of the mine concerned, and to the State Government concerned, and any comments received from the owner, agent, mining engineer, geologist or manager of the mine and the State Government within thirty days of the date of service of the notice, shall be duly considered by him before issuing any such directions. General directions applicable to a class of mines shall be issued by the Controller General with the previous approval of the Central Government in consultation with the State Government concerned.

(2) An order made under sub-rule (1) shall -

(a) in the case of an order of a general nature or affecting a class of persons, be notified in Official Gazette; and

(b) in the case of an order directed to a specified individual, be served on such individual - (i) by delivering or tendering it to that individual, or if it cannot be so delivered or tendered, by affixing it on the outer door or some other conspicuous part of the premises in which that individual lives, and a written report thereof shall be prepared and witnessed by two persons living in the neighbourhood.

55. Examination of mineral deposits and taking of samples :- The Controller General or any officer duly authorised by the Government to enter and inspect a mine, may examine any mineral deposit in any area under prospecting licence or mining lease and take samples therefrom at any time for the purposes of these rules.

56. Prohibition of deployment in certain cases :- If any mine or part thereof, which in the opinion of the Controller General, Chief Controller of Mines or the Controller of Mines poses a grave and immediate threat to the conservation of minerals or to environment, he may, by an order in writing to the owner, agent, mining engineer or manager, require him to take such measures as may be specified in the order and may prohibit, until the requirements as specified in the order are complied with to his satisfaction, the deployment of any person other than those required for compliance with the requirement of the order.

CHAPTER - IX

Revision and Penalty

57. Revision :-

(1) Any person aggrieved by any order made or direction issued under these rules by any officer subordinate to the Controller General, [ or an officer of the State Government, as the case may be,] may within thirty days of the communication of such order or direction, apply to the Controller General for a revision of the order or direction, provided that any such application may be entertained after the said period of thirty days if the applicant satisfies the Controller General that he had sufficient cause for not making the application within time. [ Provided that if any order made or direction issued as aforesaid by an officer subordinate to the Chief Controller of Mines, the application shall be made to the Chief Controller of Mines who shall deal with the application in the manner prescribed hereunder. ]

(2) Every order against which a revision application is preferred under sub-rule (1) shall be complied with pending receipt of the decision of the appellate officer : [ Provided that the Controller General or the Chief Controller of Mines, as the case may be, may suspend the operation of the order appealed against, pending disposal of the revision application. ]

(3) On receipt of an application for revision under sub-rule (1), the Controller General [or the Chief Controller of Mines, as the case may be,] after giving a reasonable opportunity of being heard to the aggrieved person, may confirm, modify or set aside the order passed by an officer subordinate to him.

[(4) Any person aggrieved by any order made or direction issued by the Chief Controller of Mines may within thirty days of the communication of such order or direction, apply to the Controller General for a revision of the order or direction, provided that any such application may be entertained after the said period of thirty days, if the applicant satisfies the Controller General that he had sufficient cause for not making the application within time. ] [(5) On receipt of any such application under sub-rule (4), the Controller General may confirm, modify or set aside the order or direction made or issued by the Chief Controller of Mines or may pass such orders in relation to the applicant, as it may deem fit and such decision shall be final. ]

(6) Every order against which a revision application is preferred under sub-rule (4), shall 2 Ibid. 5 Substituted by

G.S.R. 55 (E), dated 17.1.2000.

3 Substituted by

G.S.R. 55 (E), dated 17.1.2000. 6 Ibid.

be complied with pending receipt of the decision of the [ Controller General ].

Provided that the [ Controller General ] may, on an application made by the applicant, suspend operation of the order appealed against pending disposal of the revision application.

(7) Every application submitted under the provisions of this rule shall be accompanied by a Treasury Receipt showing that a fee of [Rs. 1000/- (rupees one thousand)] has been paid into a Government Treasury or any branch of the State Bank of India doing Treasury Business to the credit of the Central Government under 'Major Head - 0853 - Non-Ferrous Mining & Metallurgical Industries, 800 - Other receipts' or by a Bank Draft on a Nationalised Bank for [Rs. 1000/- (rupees one thousand)] in the name of Pay & Accounts Officer, Indian Bureau of Mines payable at Nagpur.

[58. Penalty :- Whoever contravenes any of the provisions of these rules shall be punishable with imprisonment for a term which may extend up to two years, or with fine extending to fifty thousand rupees or with both, and in the case of continuing contravention with an additional fine which may extend up to five thousand rupees for every day during which such contravention continues, after conviction for the first such contravention: Provided that for repeated contravention the punishment should be in the form of imprisonment only:

Provided further that any offence punishable under these rules may either before or after the institution of the prosecution, be compounded by the authorised officer to make a complaint to the court with respect to that offence, on payment to that officer for credit to the Government, of such sum that officer may specify:

Provided also that in case of an offence punishable with fine only, such sum shall not exceed the maximum amount of fine which may be imposed for that offence: Provided further that where an offence is compounded under these rules, no proceeding or further proceeding, as the case may be, shall be taken against the offender in respect of the offence so compounded, and the offender, if in custody shall be released forthwith.] CHAPTER – X Miscellaneous

59. Preservation of cores, etc. :- The owner, agent, mining engineer, geologist or manager of every mine or the holder of a prospecting licence shall preserve intact all cores and specimens of different types of rocks and minerals obtained during drilling or sinking operations and arrange for them to be laid out in a serial order with identification marks, showing the progressive depth at which they are obtained. Such specimens shall not be broken except for the purpose of analysis and testing in which case, representative samples of the specimens so broken will be preserved for a period of not less than six months from the date of completion of drilling or sinking operations. The Controller General, by an order in writing, may require the cores or specimens of rocks and minerals obtained from specific boreholes or shafts to be preserved for any specific period or relax the provisions of this rule to such an extent as he may deem fit.

60. Facilities for undertaking research or training :- Every holder of a prospecting licence or a mining lease shall afford all reasonable facilities to persons authorised by the Controller General for the purpose of undertaking research or training in matters relating to mining or geology.

61. Submission of records/reports regarding research in geology or mining :-

(1) Any person, institution or agency carrying on prospecting or mining operations related to any research in geology or mining, shall inform the Controller General and the Regional Controller, within a period of thirty days of commencement of such research related operations, indicating briefly the aspects proposed to be covered under such research together with the name and address of the person, institution, or agency carrying out such research work and the expected duration of the research related operations.

(2) (a) On completion of the said research work, a report describing the observations, analysis and conclusions reached as a result of the said research work shall be submitted to the Controller General within thirty days of its completion.

(b) The information so received will be kept confidential, if required. The Government will, however, be free to utilise the information for general studies, planning or policy making purpose.

(3) The provisions of sub-rules (1) and (2) shall also apply mutatis mutandis to any agency of the Central Government or State Government carrying out the research work.

62. Territorial jurisdiction of Controller of Mines/Regional Controller :- The Controller General may by a notification in the Official Gazette prescribe the limits of the territorial jurisdiction of the Controller of Mines and the Regional Controller for purposes of these rules.

[63. Obligation to supply other information :- The holder of reconnaissance permit, prospecting licence or mining lease, or his agent shall furnish such information regarding his reconnaissance or prospecting operations or mine or any matter connected therewith as the Controller General or the authorised officer may require by an order in writing and the information shall be furnished within such time as may be specified in the aforesaid order.]

64. Provisions of these rules to be applicable to Government :- The Government or its agencies carrying out mining operations without a mining lease shall be bound by all the provisions of these rules in the same manner as they are applicable to holders of mining leases.

65. Chief Controller of Mines etc. to exercise powers of the Regional Controller of Mines :- Any power granted under these rules to the Regional Controller of Mines may be exercised by the Controller of Mines or the Chief Controller of Mines.

66. Repeal and savings :- The Mineral Conservation and Development Rules, 1958 are hereby repealed :

Notwithstanding such repeal, anything done or any action taken, including any order made, direction given or notice issued under the Mineral Conservation and Development Rules, 1958 shall in so far as it is not inconsistent with the provisions of these rules, be deemed to have been done, taken, made, given or issued, as the case may be, within the corresponding provisions of these rules.

" SCHEDULE "

FORM-A

(Notice of commencement of prospecting operations) (See rule 7)

IMPORTANT

This Form, duly filled in must reach the concerned authorities within fifteen days of the commencement of prospecting operations.

To 1.The Controller General Indian Bureau of Mines, *2.The Controller of Mines, Indian Bureau of Mines, PIN ____________ *3.The Regional Controller Mines, Indian Bureau of Mines, PIN______________

1. Name of the mineral or minerals for which prospecting licence has been granted.

2. Name and address of the licensee.

3. In case the licensee is a Company or Partnership Firm or Co-operative, please indicate.

(i) Name and address of the Director-in-charge

(ii) Address of the Registered Office

4. Particulars of Prospecting Licence (PL):

(i) Date of execution____________________ (iii)Area under licence________ hectares.

(a)____________(c)__________ (b)____________(d)__________ PIN PIN PIN * This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area/mine falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988.

5. Location of the Prospecting Licensed Area:

(i) Topo Sheet Number ____________________ (ii)Cadastral Survey or Khasra Number _________________ __ (iv)(a)Post Office ___________________ (b)Police Station ___________________ (v)(a) Taluka ___________________

(b) District ___________________

(c) State ___________________ (b)The distance therefrom ___________________ (kilometres)

(vii) (a) Nearest Rest House/Dak Bangalow

(b) Its distance from (1)The Railway Station ___________________ (kilometres) (2)The prospecting area ___________________ (kilometres)

6. Particulars of Geologist or Mining Engineer employed for the Prospecting Licenced area:

(i) Name and address:

(ii) Qualifications

(iii) Date of appointment

(iv) Nature of appointment (Please tick ( ) mark one of the boxes whichever is applicable).

7. Date of commencement of prospecting operations:

Place:

Date:

PIN Whole time ( ) Part time ( ) Signature :

Name in full:

Designation : Owner/Agent/ Mining Engineer/Manager [ FORM-AA (Notice of commencement of reconnaissance operations)

IMPORTANT

This Form, duly filled in must reach the concerned authorities within fifteen days of the commencement of reconnaissance operations.

To, 1.The Controller General, Indian Bureau of Mines, *2.The Controller of Mines, Indian Bureau of Mines, *3.The Regional Controller Mines, Indian Bureau of Mines,

1. Name of the mineral or minerals for which reconnaissance permit has been granted.

2. Name and address of the permit holder

3. In case the permit holder is a Company or Partnership Firm or Co-operative, please indicate.

(i) Name and address of the Director-in- charge (ii)Address of the Registered Office

4. Particulars of reconnaissance permit.

(i) Date of execution

(ii) Period

(iii) Area under permit

1. Inserted by G.S.R. No. 55 (E), dated 17.1.2000.

from _______to_________ ________ hectares.

5. Location of the reconnaissance permit Area (A map showing the location on Scale 1:250,000 should be enclosed).

(i) Topo Sheet Number (s)

(ii) Co-ordinates of corner points

(b) State

6. Particulars of Geologist or Mining Engineer, if any, employed for the reconnaissance.

(i) Name and address:

(ii) Qualifications

(iii) Date of appointment

(iv) Nature of appoinment (Please tick (  ) mark one of the boxes whichever is applicable)

7. Date of commencement of reconnaissance operations Place :

Date :

Whole time ( ) Part time ( ) Signature Name in full :

* This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988.]

FORM-B

(Yearly Report of the Prospecting Operations carried out) [See rule 8(1)(b) and 8(2)] To _________________________________________ 1. The Controller General, IMPORTANT Indian Bureau of Mines, Nagpur - 440 001 This Form, duly filled in must reach the concerned authorities within thirty days after expiration of *2.The Controller of Mines, one year from the date of execution of prospecting Indian Bureau of Mines, licence or the expiry of prospecting licence PIN _________ or abandonment of prospecting operations, *3. The Regional Controller Mines, whichever is earlier. Indian Bureau of Mines, _________________________________________ PIN__________

4. State Government concerned.

1. Name of the mineral or minerals for which (a)______________(c)_____________ prospecting licence has been granted. (b)______________(d)_____________

2. Name and address of the licensee _______________________________ PIN

3. Particulars of Prospecting Licence (PL):

(i) Date of execution ________________________

(ii) Period ______________ years, from ____________to___________

(iii) Area under licence_______________________ hectares.

(iv) Number and date assigned by State Government to (a) Number _______________ Prospecting Licence. (b) Date _________________

4. Location of Prospecting Licensed Area:

(i) Topo Sheet Number ___________________

(ii) Cadastral Survey or Khasra Number ___________________

(iii) Village ___________________ *This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area/mine falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988.

(b) District ___________________

(c) State ___________________

5. Particulars of the Geologist /Mining Engineer-in-charge of Prospecting operations :

(i) Name and address: _____________________ PIN_____________

(ii) Qualifications _____________________

(iii) Date of appointment ______________________

(iv) Nature of appointment Whole time ( ) Part time ( ) (Please tick ( ) mark one of the boxes whichever is applicable)

6. (i) Status of prospecting operation: In progress [ ] Please tick ( ) mark one of the boxes whichever is Completed [ ] applicable. Abandoned [ ]

(ii) If prospecting operation is completed or abandoned, date of such completion or abandonment. ______________________

7. Total surface area covered by prospecting work (hectares) as on date_______________

8. Completion of prospecting work during the year:

(a) Pitting (i)Number of pits _________________

(ii) Depth (metres) Average _______________ Maximum _______________ Minimum _______________

(b) Trenching (i)Number of trenches ____________________

(ii) Length (metres) Average ______________ Maximum ______________ Minimum ______________

(c) Drilling Surface Underground

(i) Number of boreholes completed _____________ _____________ during the year.

(ii) Number of boreholes in progress, _____________ _____________ if any (iii)Total annual drilling (metres) _____________ _____________

(d) Particulars of drilling machines: Type Make Capacity Number of drills

(e) Exploratory mining, if any:

(1) Number of levels ______________________________________________

(2) Total development (metres) ______________________________________________

(3) Mode of entry ______________________________________________

(4) Quantity of ore produced ______________________________________________ with grade

(f) Number of samples analysed:

(1) Main constituent (please specify)

(2) Complete analysis Note: Please enclose a geological report describing the prospecting operations undertaken so far along with the detailed geological plans and sections showing locations of (a) boreholes, (b) pits, (c) trenches,

(d) shafts, (e) underground exploratory workings, (f) outcrops, (g) ore zones, (h) faults, (i) folds and other geological features.

The Report shall contain in the borehole logs and interpretation and the inferences drawn as a result of the study of the geology of the area and the interpretation of the borehole cores, pits, trenches, assay data, reserves of ore and contain results of complete analysis of at least two representative samples of ore and the blocks proposed for mining operations. The report shall also contain the results of any beneficiation study carried out on the ores or minerals of the area. Place: Signature :

Date: Name in full:

Designation : Owner/Agent/ Mining Engineer/Manager [ FORM-BB Progress report of reconnaissance survey in respect of ________________[ the name of the mineral(s) ]_____________________________________ for the year __________ Submitted to :

__________________________________________ 1. The Controller General, IMPORTANT Indian Bureau of Mines, Nagpur - 440 001 This Form, fully filled in must reach the concerned authorities within thirty days after expiration of *2.The Controller of Mines, one year from the date of execution of reconnaissance Indian Bureau of Mines permit or the expiry of reconnaissance permit or abandonment of reconnaissance operations, *3. The Regional Controller Mines, whichever is earlier. Indian Bureau of Mines

4. State Government concerned.

1. Name of the permit holder _______________________________

2. Nature of the firm _______________________________

3. Address of the firm _______________________________

4. Area under permit ____________________ (square kms.)

5. Location:

(i) Topo Sheet No.(s) _______________________________

(ii) Co-ordinates of corner points _______________________________

(iv) State _______________________________

6. Date of grant of permit _______________________________

7. Period of permit _______________________________

8. Reconnaissance survey work done (A brief description of the work involved along with particulars of the machines and instruments used would be given against each of the following items)

(i) Regional Survey _______________________________

(iii) Geological Mapping including area covered and scale _______________________________

(iv) Geophysical _______________________________

(v) Geochemical _______________________________

(vi) Test drilling : Number, area of influence meterage and sampling _______________________________

9. Nature and structure of the ore body _______________________________

10. Analysis of the ores or minerals _______________________________

11. If abandoned

(i) Date of abandonment _______________________________

(ii) Reasons for abandonment _______________________________ Signature _______________________ (Full name of the Signatory) Designation ______________________ and Address _____________________ Date of despatch _____________________ * This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988.]

FORM-C

(Notice of intimation of opening/reopening of mine/change in the name of mine) (See rule 22(1), 22(2), 25 & 49)

IMPORTANT

Notice in this Form shall be sent so as to reach concerned authorities within 15 days of the date of opening /reopening / change in Name of mine To

1. The Controller General, Indian Bureau of Mines, Nagpur - 440 001

2. The Controller of Mines ----------------------- Zone Indian Bureau of Mines, PIN_________

3. The Regional Controller Mines, Indian Bureau of Mines, PIN__________

4. State Government concerned.

1. (i) Name of the mineral worked

(ii) Name(s) of other minerals if any, for which lease has been granted:

2. (i) Name of the mine

(ii) Change in the name of mines, if any:

(Indicate old name and reason of change)

3. Name and address of the lessee/owner:

4. Ownership of the mine [ 4A. Date of opening/reopening of mine _________________________ 4B. In case of reopening, date of discontinuation:] _________________________

5. Particulars of the Mining Lease (ML):

(i) Date of execution:

(ii)Period: ____________ Years, from _____________ to_______________

(iii) Areas under lease:_________________ hectares

6. Location of the Mining Lease:

(i) Village_____________Distt.______________Taluka/Tahsil_______________ (iii)Nearest railway station ______________ Distance ____________________

7. Name and address of previous owner, if any and the date of abandonment:

8. Particulars of Agent:

Name and address:

9. Particulars of Mining Engineer employed in the mines:

(i) Name and address:

(ii) Qualification :

(iii) Date of appointment :

(iv) Status of employment: Whole time Part time

10. Particulars of the Manager of the mine:

Name and address

11. Letter No. and date through which the mining plan was approved by the Indian Bureau of Mines.

Letter No.

Place:

Date:

(Strike out the items which are not applicable) PIN Date Date:

Signature :

Name in full:

1[ FORM – D (Notice of intention of abandonment of mine or part of the mine) [See rule 23(2)] To

IMPORTANT

1. The Controller General Indian Bureau of Mines, Nagpur – 440 001

2. The Controller of Mines, Indian Bureau of Mines, __________________ PIN

3. The Regional Controller of Mines, Indian Bureau of Mines.

4. State Government Concerned Notice in Form shall reach the concerned authorities within 90 days of the date of intention of abandonment.

1. (i) Name of the mineral worked: ____________________

(ii) Name of other mineral worked, if any: ____________________

2. Name of the mine ____________________

3. Name and address of the Lessee/Owner : ____________________

4. Particulars of Mining Lease (ML):

(i) Date of Execution:

(iii) Area under lease___________________ hectares.

5. Location of Mine

(a) Village:

(c) District:

(d) State:

6. Name and address of Agent:

7. Name and address of Mining Engineer:

8. Date of abandonment

9. Reasons for abandonment: [Please tick whichever is applicable] i) Lack of demand ii) Exhaustion of ore/mineral iii) Un-economic operations

10. Reserve of Mineral(s) in Mining Lease area (in tonne):

i) Proved ii) Probable iii) Possible

11. Number of workers employed in the mine: Male Female a) Company labour Total Place: Signature Date : Name in full:

Designation:

(Notice of temporary discontinuance of mine) [See rule 24] To

IMPORTANT

1. The Controller General Indian Bureau of Mines, Nagpur – 440 001

2. The Controller of Mines, Indian Bureau of Mines, __________________ PIN

3. The Regional Controller of Mines, Indian Bureau of Mines.

4. State Government Concerned Notice in Form shall reach the concerned authorities within one hunred and five days of temporary discontinuance of work in the mine. If the discontinuance is due to natural calamity beyond the control of the lessee or Government Orders, this notice shall be sent within fifteen days of such occurrence.

2. (i) Name of the mineral worked: ____________________

(ii) Name of other mineral worked, if any: ____________________

2. Name of the mine ____________________

3. Name and address of the Lessee/Owner : ____________________

4. Particulars of Mining Lease (ML):

(i) Date of Execution:

(iii) Area under lease___________________ hectares.

5. Location of Mine

(a) Village:

(c) District:

(d) State:

6. Name and address of Agent:

7. Name and address of Mining Engineer:

8. Date of temporary discontinuance:

9. Reasons for temporary discontinuance: [Please tick whichever is applicable] i) Lack of demand ii) Non-availability of labour iii) Rains vi) Operations becoming un-economic vii) Other reasons (specify)

10. Probable date of re-opening of the mine:

Place: Signature Date : Name in full:

Designation:

FORM-E

(Notice of commencement of stoping) [See rule 26(2)] MINE CODE__________ To ___________________________________ 1. The Controller General, IMPORTANT Indian Bureau of Mines, Notice in this Form shall be sent at least sixty Nagpur - 440 001 days before the commencement of stoping operations to the concerned authority. *2. The Controller of Mines, __________________________________ Indian Bureau of Mines, PIN_________ *3. The Regional Controller of Mines Indian Bureau of Mines, PIN __________

4. State Government concerned.

1. (a) Name of mine ____________________________________________

2. Name and address of

(a) Owner _________________________________________________________

(b) Agent _________________________________________________________

(c) Manager _________________________________________________________ employed under rule 42 _________________________________________________________

3. Date of expiry of lease: ___________________________________

4. Date on which it is proposed to commence stoping ___________________________________

5. Extent of development in the mine: ___________________________________

(a) Number of shafts/inclines/and its

(b) Maximum depth and development ___________________________________ * This should be sent to the Controller of Mines/Regional Controller of Mines in whose territorial jurisdiction the area/mine falls as notified from time to time by the Controller General, Indian Bureau of Mines, under rule 62 of the Mineral Conservation and Development Rules, 1988. ** This is applicable in cases where the main mine is divided into more than one district/section/pit.

(c) Number of levels with their extent ____________________________________

(d) Total meterage of development ___________________________________

(e) Total number of blocks developed including the total tonnage and grade (excluding blocks already stoped out and already permitted for stoping) __________________________________

6. Details of the blocks applied for stoping

(a) Number and size of each block, their levels tonnage and grade _________________________________

(b) Method of stoping to be adopted -

(i) A description of the method with appropriate drawings to illustrate the stope preparation sequence of operation and extraction __________________________________ (ii)Rate of stoping contemplated in each block (monthly) ___________________________________ (iii)Estimated recovery from each block ____________________________________

(v) Estimated tonnage and grade of ore to be extracted _____________________________________

7. Is this a first application for stoping for this mine? If not, the following details may be furnished.

(i) Date of previous application(s) for stoping: ____________________________________

(ii) Date and reference of permission or refusal by this department (mention blocks and their levels) ___________________________________

(iii) Have all the blocks for which stoping permission was granted, been stoped out? If not, mention the specific blocks that are remaining to be stoped out, indicating the state of stoping operations therein: _________________________________

8. Rate of development and programme of forming additional stope blocks simultaneously with the proposed stoping. __________________________________

9. List of enclosures ___________________________________ Place: Signature Date: Name in full:

Designation: Owner/Agent/ Mining Engineer/Manager Note: Information in respect of items 5 and 6 (a) should be accompanied by (i) underground composite plan,

(ii) longitudinal section, (iii) geological/assay plan of the levels at which stoping is proposed including one level above and below, and (iv) transverse sections at reasonable intervals for the portion covered under (iii) above. [FORM F-1 For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (i)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral IRON ORE d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes)

1. Type of ore produced:

(Tick mark, whichever is applicable)

(a) Hematite

(b) Magnetite

2. Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings 3.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore: Grades(% of Fe content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ MT) i) Lumps:-

(a) Below 55%

(b) 55% to below 58%

(c) 58% to below 60%

(d) 60% to below 62%

(e) 62% to below 65%

(f) 65% and above ii) Fines:-

(a) Below 55%

(b) 55% to below 58%

(c) 58% to below 60%

(d) 60% to below 62%

(e) 62% to below 65%

(f) 65% and above iii) Concentrates

4. Details of Deductions used for computation of Sale price (Ex-Mine)(Rs/Tonne) Deduction claimed Unit ( in Rs/Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g) I I

5. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether 1[Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despatches in terms of Quantity for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

6. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

7. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month.

a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-2

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (ii)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral MANGANESE ORE d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes)

1. Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings 2.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore: Grades(% of Mn content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ Metric Tonne)

(a) Below 25%

(b) 25% to below 35%

(c) 1[35% to below 46%]

(d) 46% and above 2[(f) Concentrates]

3. Details of Deductions used for computation of Ex-Mine Price(Rs/Metric Tonne) Deduction claimed Unit ( in Rs/Metric Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for 3[Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despatches in terms of Quantity, for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral), if any, during the month compared to the previous month.

a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-3

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (iii)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral 1[Bauxite/Laterite] d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes) 1.Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings

(b) From Underground workings 2.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore: content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ Metric Tonne) (A) For use in alumina and aluminium extraction:- (Please furnish averages of the following ranges of grades):

(a) Below 40%

(b) 40% to below 45%

(c) 45% to below 50%

(d) 50% to below 55%

(e) 55% to below 60%

(f) 60% and above (B) For use other than alumina and aluminium metal extraction:

(a) Cement

(b) Abrasive

(c) Refractory

(d) Chemical ]

3. Details of Deductions used for computation of Ex-Mine price (Rs/ Metric Tonne): Deduction claimed Unit ( in Rs/Metric Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for 1[Sale] or Captive consumpt ion or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity, for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month. a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-4

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (iv)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral Chromite d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes) 1.Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings

(b) From Underground workings 2.Grade-wise Production, Despatches ,Stocks and Ex- mine prices of Processed ore:

1[Grades(% of Cr2O3 content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ Metric Tonne) A. Lumps:-

(b) 40% to below 52 % Cr2O3

(c) 52% Cr2O3 and above B. Fines:-

(b) 40% to below 52 % Cr2O3

(c) 52% Cr2O3 and above C. Concentrates]

3. Details of Deductions used for computation of Ex-Mine price (Rs/Metric Tonne): Deduction claimed Unit ( in Rs/Metric Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: G R A D E Nature of Despatch (indicate whether for 2[Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (in Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despatches in terms of Quantity, for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month.

a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-5

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (v)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral Copper/Gold/Lead/Pyrites/Tin/Tungsten/Zinc d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs.__________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes; indicate unit of quantity if not in tonnes.)

1. Production and Stocks of R.O.M. ore Opening stocks Production Closing stocks Quantity Metal content/ grade Quantity Metal content/ grade Quantity Metal content/ grade A. From Underground workings i) From development ii) From Stoping B. From Opencast workings Total

2. Ex-mine price of the ore produced (Rs. per unit):

3. Recoveries at Concentrator/Mill/Plant: (Quantity in tonnes & Value in Rs.) Opening stocks of the Ore at Ore received from the mine Ore treated Concentrates * Obtained Tailings Closing stocks of concentrates the Quantity Value Metal Quantity Metal Quantity Metal *In case of any leaching method adopted, give quantity recovered and grade contained separately.

4. Recovery at the Smelter/Mill/Plant:- Opening Stocks of the concentrates at the smelter /Plant Concentrates received from Concentrates received from other sources (specify) Concentrates sold (if any) Quantity Metal content/ grade Quantity Metal content/ grade Quantity Metal content/ grade Quantity Metal content/ grade Concentrates treated Metals(*) recovered(specify) Other by-products ,if any, recovered Closing stocks of concentrate at the Quantity Metal content/ grade Quantity Value Grade Quantity Value Grade Quantity Value I I

5. Sales during the month:- Opening stocks of metals/Products 1[Place of Sale] Closing stocks of Quantity Grade Quantity Grade Value(#) Quantity Value Note:

(*) Please give category-wise break-up viz. blister, fire refined copper, cathodes, electrolytic copper wire bars, lead ingots, zinc cathodes, zinc dross, gold, tungsten etc.

(#) Please give ex-plant sale value including excise duty but excluding other taxes. (@) Please give category-wide break-up of metals and other products sold.

6. Details of Deductions used for computation of Ex_mine price of ore (Rs/unit) Deduction claimed Unit ( in Rs/unit) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

7. Sales/ Despatches effected for Domestic Consumption and for Exports: Nature of Despatch (indicate whether for 1[ Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) *This includes ore as well as concentrates.

## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity,for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

8. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

9. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month. a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-6

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (vi)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral MICA d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

1[1. Production, despatches and stocks of crude and dressed mica. ( in kilograms) obtained incidental to mining Waste/ mica obtained after preliminary dressing (at mine site)

A. OPENING STOCKS

(at the Beginning of the month) i) at Mine ii) at Dressing unit iii) at any Other point(Please specify) Total (Opening Stock) B. Production i)From underground mining ii)From opencast mining iii) From dump working Total (Production)

C. DESPATCHES

i)for dressing ii)for Sale Total (Despatches)

D.CLOSING STOCKS

i)At mine (ii)At dressing unit (iii)At any other point (Please specify) Total (Closing Stocks) (#)This should be estimated for all crude mica/ waste mica produced whether sold or not on the basis of the average sale price obtainable for crude/ waste mica in the market. To arrive at the ex-mine price from this notional sale price, the cost of transport from the mine head to the market or factory and any other incidental charges may be deducted .

2. Details of Deductions used for computation of Ex-Mine price (Rs/kg): Deduction claimed Unit ( in Rs/kg) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

3. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for Sale or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despatches in terms of Quantity for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

4. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

5. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month. a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-7

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (vii)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs.________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

1.R.O.M production:- Category Unit of quantity Quantity (If there are different types of R.O.M. production, separate figures should be furnished for each type of R.O.M indicating in each case the appropriate unit of quantity.)

2. Production, stocks and despatches:- Gem Variety Industrial Others Rough and uncut stones Cut and Polished Stones No of stones Qty @ No of stones Qty @ No of stones Qty @ No of stones Qty @ A .Opening stocks i)From Opencast Working ii)From underground working TOTAL (Production) D.Closing Stocks ( @The Unit of quantity viz. Carats/Grams/Kilogram etc. as the case may be should be indicated under quantity.) *This should be estimated for all the stones produced during the month whether sold or not on the basis of average sale price obtained for sales made during the month. In case no sales are made Ex-pit-head, the ex-mine price should be arrived at after deducting the actual expenses incurred from the pit-head to the point of sale, from the sale price realised.

3. Details of Deductions used for computation of Ex-Mine price (Rs/unit): Deduction claimed ( in Rs/ unit) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: Nature of Despatch (indicate whether for Sale or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) #Grades:- i)Gem Variety a) Rough and uncut stones b) Cut and Polished Stones; ii) Industrial iii)Others ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral), if any, during the month compared to the previous month.

a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

FORM F-8

For the month of ________20

MONTHLY RETURN

[See rule 45(5) (a) (viii)] (Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General and Labour)

1. Details of the Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return) c) Name of the Mineral d) Name of Mine if any, produced from the same mine f) Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

2. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

3. Details of Rent/ Royalty / Dead Rent paid in the month

(i) Rent paid for the period (Rs.)

(ii) Royalty paid for the period (Rs.)

(iii) Dead Rent paid for the period (in Rs)

4. Details on working of mine:

(i) Number of days the mine worked:

(ii) Reasons for work stoppage in the mine during the month (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each reason separately Reasons No of days

5. (i) Average Daily Employment and Wages paid:

Work place Direct Contract Wages (Rs.) Male Female Male Female Direct Contract Below ground Opencast Above ground Total 5.(ii) Total number of technical and supervisory staff employed in the mine during the month :___________________

(iii) Total salaries paid to technical and supervisory staff employed in the mine during the month in Rs._________________

PART-II (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes) 1.Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings

(b) From Underground workings 2.Grade-wise Production, Despatches ,Stocks and Ex-mine price of Processed/Sorted ore: Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price Tonne) 1[* The grades are as below:-

MINERAL GRADES

Asbestos a)Amphibole Barytes (a) White (including snow-white) Fluorite/Fluorspar (a) 85% CaF2 and above

(c) 30 to below 70% CaF2 Graphite (a) with 80 per cent or more fixed carbon b) with 40 per cent or more but less than 80 per cent fixed carbon c)with less than 40% fixed carbon Kaolin/China clay, Ball clay, White shale, White clay a) Crude (Natural) b) Processed Kyanite (a) 40% Al2O3 & above Limestone a) LD, and b) 25- 30 % P2O5 c) 20-25% P2O5 d) 15-20% P2O5 Talc/Steatite/Soapstone (a) Insecticide (filler) grade

(b) Other than insecticide (filler) grade] 3(i) In case the mineral is being pulverized in own factory, please give the following particulars:- Grade Total quantity of mineral tonnes) Total quantity of pulverized mineral produced (for each mesh size) Total Quantity of pulverized mineral sold during the year Mesh size Quantity (tonne) Mesh size Quantity (tonne) Ex-factory Sale 3(ii) Average cost of pulverization : Rs _______ per tonne.

4. Details of Deductions used for computation of Ex-Mine price (Rs/Metric Tonne): Deduction claimed Unit ( in Rs/Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

5. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for 1[Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer Quantity Sale value Country Quantity F.O.B ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity, for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

6. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

7. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral), if any, during the month compared to the previous month.

a) b) c) I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

[FORM H-1 For the financial year 1st April, 20__ to 31st March,20____

ANNUAL RETURN

(Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General )

1. Details of Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return)

(c) Name of the Mineral IRON ORE

(d) Name of Mine if any, produced from the same mine

2. Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

3. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

4.Registered Office of the Lessee

5. Director in charge :

6. Agent :

7. Manager :

8.Mining Engineer in charge:

9. Geologist in charge :

10. Transferer (previous owner) if any, and date of transfer:

11. Particulars of area operated/Lease (Furnish information on items (i) to (v) lease-wise in case mine workings cover more than one lease)

(i) Area under lease (hectares):

Under Forest Outside Forest Total

(ii) Date of execution of mining lease deed

(iii) Period of lease

(iv) Area for which surface rights are held (hectares)

(v) Date and period of renewal (if applicable)

(vi) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced

12. Lease area (surface area) utilisation as at the end of year (hectares): Under forest Outside forest Total

(i) Already exploited & abandoned by opencast (O/C) mining

(ii) Covered under current (O/C) Workings

(iii) Reclaimed/rehabilitated

(iv) Used for waste disposal

(v) Occupied by plant, buildings, residential, welfare buildings & roads

(vi) Used for any other purpose (specify)

(vii) Work done under progressive mine closure plan during the year

13. Ownership/exploiting Agency of the mine:

PART - II (Employment & Wages) 1.Number of technical and supervisory staff employed at the mine Description Wholly employed Partly employed

(i) Graduate Mining Engineer

(ii) Diploma Mining Engineer

(iii) Geologist

(iv) Surveyor

(v) Other administrative clerical and technical supervisory staff Total:- 2.(i) Number of days the mine worked:

(ii) No.of shifts per day:

(iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately .

Reasons No of days 3.(i) Employment of Labour and wages paid:- Maximum number of persons employed on any one day during the year: (i)In workings below ground on ......................(a)................. (ii)In all in the mine on ..........................(a)................. Classification Total number of man days worked during the year No. of days worked during the year Average daily number of persons employed Total Wages /Salary bills for the year Direct Contract Total Male Female Total A. Below Ground i) Foreman and mining mates ii) Face workers and Loaders iii) Others i) Foreman and mining mates ii) Face workers and Loaders iii) Others

(i) Clerical & Supervisory Staff. (excluding the superior supervisory staff.)

(ii) Workers in any Attached factory, Workshop or mineral dressing plant.

(iii) Others Total:

3. (ii) Total salaries paid to technical and supervisory staff employed in the mine during the year ( in Rs.)__________________ 1[PART-II A (Capital Structure) (in respect of the mine, beneficiation plant, mine, work-shop, power and water installation) Description As at the beginning of the year Additions during the Year Sold or discarded during the year Depreciation during the year Net closing Balance Estimated market

(i) Land***

(ii) Building:

Industrial Residential

(iii) Plant and Machinery including transport equipment iv) Capitalised Expenditure such as pre- production exploration, development, major overhaul and repair to machinery etc.(As prescribed under Income Tax Act) Total * In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mines return and also indicate the names of other mines in which the information relates in the form provided above. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.

** Optional and may be furnished in respect of items (i),(ii) and (iii) if the mine owner desires. *** Including any non recurring expenditure incurred on the acquisition of land.

2. Source of Finance (as at the end of the year) :-

(i) Paid up Share Capital (Rs.'000) (iii)Reserve & Surplus (All Types) (iv)Long Term loans outstanding Indicate the names of the leading institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.

3.Interest and Rent (in Rs.’000)

(i) Interest paid during the year

(ii) Rents (excluding surface rent) paid during the year PART - III (Consumption of Materials)

1. Quantity and cost of material consumed during the year Description Unit Quantity Value (Rs.)

(i) Fuel

(a) Coal Tonnes

(ii) Lubricant

(a) Lubricant oil Ltrs.

(iii) Electricity

(iv) Explosives (furnish full details in Part IV) (vii)Drill roads & kits Nos.

2. Royalty and Rents (in’ 000 Rs.):

X Paid for current year Paid towards past arrears

(a) Royalty

3. Compensation paid for felling trees during the year (in Rs)

4. Depreciation on fixed assets Rs

5. Taxes and cesses X Amount in Rs. paid during the year to:

X Central Govt. State Govt.

(i) Sales Tax

(iii) Other taxes & cesses:-

(a) Mineral cess

(b) Cess on dead rent

(c) Others (please specify) 1[6. Other expenses:

(i) Overheads

(ii) Maintenance

(iii) Money value of other benefits paid to workmen

(iv) Payment made to professional agencies] Part –IV ( Consumption of Explosives)

1. Licensed capacity of magazine: (specify unit separately in kg/tonne, numbers, metres ) Item Unit Capacity

2. Total production during the year (Tonne):

3. Overburden removed:

Classification of Explosives Unit Quantity consumed during the year Esitmated requirement during the next year Small dia.

(upto 32 mm) Large dia. (above 32 mm) Small dia.

(upto 32 mm) Large dia. (above 32 mm) b.Ammonium nitrate in cartridged form cartridges Kg.

5.Slurry explosives (Mention different trade names) Kg.

i) Ordinary

(a) Ordinary

(b) Delay (a)Safety Fuse (b)Detonating Fuse 9.Others (specify) (Mention the unit) Different sizes of soaked liquid oxygen cartridges to be equivalent kg. as per manufacturer’s instruction. PART – V (General Geology & Mining) (Details on items 1, 2, 6 & 7(i) may be given once in 5 years)

1. Mineral(s) worked and their characteristics : (In case more than one mineral is worked, the information asked for under (a) to (d) in respect of the remaining mineral(s) may be furnished in a separate sheet and attached with the return)

(a) Name of mineral :

1[(b)…(c)] [(b) Type of ore (Tick mark whichever is applicable)

(i) Lump

(ii) Fines

(iii) Friable

(iv) Granular

(v) Platy

(vi) Fibrous

(vii) Any other (specify), Powdery etc.

(c) Quality:

Chemical Analysis of Typical Grades Produced Constituent Grade

(i) Size Range

(iii) Subsidiary Constituents 2.(a) Name of rock/mineral excavated and disposed as waste:

(b) Name(s) of the ore/mineral excavated but not sold i.e., mineral reject:

(c) Typical analysis of mineral reject(s) Item 1. 2. 3. 4.

Mineral reject 2[3. Reserves and Resources estimated at the end of the year. Classification Code Quantity Grade (as per NMI grades as indicated in the mining plan) Total Mineral Resources (A + B) A. Mineral Reserve

1. Proved Mineral Reserve

2. Probable Mineral Reserve

1. Feasibility Mineral Resource

3. Measured Mineral Resource

4. Indicated Mineral Resource

5. Inferred Mineral Resource 121 and 122 221 and 222 Note.- For the removal of doubts, the classification terms and codes mentioned in this Form shall have the same meaning as assigned to them in the Guidelines issued by Indian Bureau of Mines in this regard.]

4. Mining Operations during the year:

4.1. Exploration Item Number Meterage Grid/Dimension (as applicable) Drilling Trenching Pitting 4.2 Opencast (A) Details of Benches (Separately for mechanised and manual sections) In ore In OB/Waste

(i) Number of Benches

(ii) Average height (metres)

(iiii) Depth of the deepest working from adjacent ground (M): (B) (i) Total ROM Ore production (tonnes):

(ii) Mineral Rejects generated with grades (tonnes):

(C) Total quantity of Overburden/Waste removed during the year (tonnes) During the year Cumulative so far

(i) Quantity back filled

(ii) Quantity disposed of in external dumps 4.3 Underground:

(a) Driving (metres) in ore:

(b) Cross Cutting/Footwall Drives (in barren) (Metres) :

(e) Shaft sinking (metres):

(f) Stope preparation (metres):

(g) Tonnage of ore blocked for stoping (tonnes):

(h) Quantity of waste removed (tonnes):

(i) Quantity of mineral rejects generated with grade (tonnes): Within lease area Outside lease area 4.4 i) Number of trees planted during the year ii) Survival rate in percentage

5. Type and aggregate Horse Power of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc. Details of any new machinery added during the year may be furnished with cost. Type of machinery Capacity of each unit No.of units H.P. of each unit electrical (specify) Used in opencast/ 6.(i) Give details of future plans, if any, of exploration and development, production schedule, replacements and expansion of machinery and equipment etc.

(ii) If you have laboratory facilities for R & D and if so, give a brief description: 7.(i) Details of mineral Treatment Plant, if any. Give a brief description of the process capacity of the machinery deployed and its availability. (Enclose Flow Sheet and Material Balance of the Plant).

(ii) Furnish following information every year:

Item Tonnage Average Grade Feed:

Concentrates :

Tailings:

8. Furnish surface and/or underground plans and sections as prepared and brought uptodate (as required under rule 28 of MCDR)

9. Please indicate the salient features which affected mining operations during the year.

PART-VI (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes)

1. Type of ore produced:

(Tick mark, whichever is applicable)

(a) Hematite

(b) Magnetite

2. Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings 3.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore: Grades(% of Fe content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ MT) i) Lumps:-

(a) Below 55%

(b) 55% to below 58%

(c) 58% to below 60%

(d) 60% to below 62%

(e) 62% to below 65%

(f) 65% and above ii) Fines:-

(a) Below 55%

(b) 55% to below 58%

(c) 58% to below 60%

(d) 60% to below 62%

(e) 62% to below 65%

(f) 65% and above iii) Concentrates

4. Details of Deductions used for computation of Sale price (Ex-Mine)(Rs/Tonne) Deduction claimed Unit ( in Rs/Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) duty(indicate name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

5. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for 1[Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.)

I I I

## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

6. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

7. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral), if any, during the month compared to the previous month.

a) b) c) PART-VII: COST OF PRODUCTION Cost of production per tonne of ore/mineral produced Item Cost Per metric tonne

(i) Direct Cost

(a) Exploration

(b) Mining

(iii) Depreciation

(iv) Interest

(v) Royalty

(vi) Taxes

(vii) Dead Rent

(viii) Others (specify) Total Note: Information given under Part VI will be kept confidential, if required. The Government, however, will be free to utilize the information for general studies without revealing the identity or working cost of the firm.

VERIFICATION

I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

Designation: Owner/Agent/ Mining Engineer/Manager

FORM H-2

For the financial year 1st April, 20__ to 31st March,20____

ANNUAL RETURN

(Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General )

1. Details of Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return)

(c) Name of the Mineral Manganese Ore

(d) Name of Mine if any, produced from the same mine

2. Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

3. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

4.Registered Office of the Lessee

5. Director in charge :

6. Agent :

7. Manager :

8.Mining Engineer in charge:

9. Geologist in charge :

10. Transferer (previous owner) if any, and date of transfer:

11. Particulars of area operated/Lease (Furnish information on items (i) to (v) lease-wise in case mine workings cover more than one lease)

(i) Area under lease (hectares):

Under Forest Outside Forest Total

(ii) Date of execution of mining lease deed

(iii) Period of lease

(iv) Area for which surface rights are held (hectares)

(v) Date and period of renewal (if applicable)

(vi) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced

12. Lease area (surface area) utilisation as at the end of year (hectares): Under forest Outside forest Total

(i) Already exploited & abandoned by opencast (O/C) mining

(ii) Covered under current (O/C) Workings

(iii) Reclaimed/rehabilitated

(iv) Used for waste disposal

(v) Occupied by plant, buildings, residential, welfare buildings & roads

(vi) Used for any other purpose (specify)

(vii) Work done under progressive mine closure plan during the year

13. Ownership/exploiting Agency of the mine:

PART - II (Employment & Wages) 1.Number of technical and supervisory staff employed at the mine Description Wholly employed Partly employed

(i) Graduate Mining Engineer

(ii) Diploma Mining Engineer

(iii) Geologist

(iv) Surveyor

(v) Other administrative clerical and technical supervisory staff Total:- 2.(i) Number of days the mine worked:

(ii) No.of shifts per day:

(iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately .

Reasons No of days 3.(i) Employment of Labour and wages paid:- Maximum number of persons employed on any one day during the year: (i)In workings below ground on ......................(a)................. (ii)In all in the mine on ..........................(a)................. Classification Total number of man days worked during the year No. of days worked during the year Average daily number of persons employed Total Wages /Salary bills for the year Direct Contract Total Male Female Total A. Below Ground i) Foreman and mining mates ii) Face workers and Loaders iii) Others i) Foreman and mining mates ii) Face workers and Loaders iii) Others

(i) Clerical & Supervisory Staff. (excluding the superior supervisory staff.)

(ii) Workers in any Attached factory, Workshop or mineral dressing plant.

(iii) Others Total:

3. (ii) Total salaries paid to technical and supervisory staff employed in the mine during the year ( in Rs.)________________ PART-II A (Capital Structure) (in respect of the mine, beneficiation plant, mine, work-shop, power and water installation) Description As at the beginning of the year Additions during the Year Sold or discarded during the year Depreciation during the year Net closing Balance Estimated market

(ii) Building:

Industrial Residential

(iii) Plant and Machinery including transport equipment iv) Capitalised Expenditure such as pre- production exploration, development, major overhaul and repair to machinery etc.(As prescribed under Income Tax Act) Total * In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mines return and also indicate the names of other mines in which the information relates in the form provided above. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.

** Optional and may be furnished in respect of items (i),(ii) and (iii) if the mine owner desires. *** Including any non recurring expenditure incurred on the acquisition of land.

2. Source of Finance (as at the end of the year) :-

(i) Paid up Share Capital (Rs.'000) (iii)Reserve & Surplus (All Types) (iv)Long Term loans outstanding Indicate the names of the leading institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.

3.Interest and Rent (in Rs.’000)

(i) Interest paid during the year

(ii) Rents (excluding surface rent) paid during the year PART - III (Consumption of Materials)

1. Quantity and cost of material consumed during the year Description Unit Quantity Value (Rs.)

(i) Fuel

(a) Coal Tonnes

(ii) Lubricant

(a) Lubricant oil Ltrs.

(iii) Electricity

(iv) Explosives (furnish full details in Part IV) (vii)Drill roads & kits Nos.

I I

2. Royalty and Rents (in’ 000 Rs.):

X Paid for current year Paid towards past arrears

(a) Royalty

3. Compensation paid for felling trees during the year (in Rs)

4. Depreciation on fixed assets Rs

5. Taxes and cesses X Amount in Rs. paid during the year to:

X Central Govt. State Govt.

(i) Sales Tax

(iii) Other taxes & cesses:-

(a) Mineral cess

(b) Cess on dead rent

(c) Others (please specify)

6. Other expenses:

(i) Overheads

(ii) Maintenance

(iii) Money value of other benefits paid to workmen

(iv) Payment made to professional agencies Part –IV ( Consumption of Explosives)

1. Licensed capacity of magazine: (specify unit separately in kg/tonne, numbers, metres) Item Unit Capacity

2. Total production during the year (Tonne):

3. Overburden removed:

Classification of Explosives Unit Quantity consumed during the year Estimated requirement during the next year Small dia.

(upto 32 mm) Large dia. (above 32 mm) Small dia.

(upto 32 mm) Large dia. (above 32 mm) b.Ammonium nitrate in cartridged form cartridges Kg.

5.Slurry explosives (Mention different trade names) Kg.

i) Ordinary

(a) Ordinary

(b) Delay (a)Safety Fuse (b)Detonating Fuse 9.Others (specify) (Mention the unit) Different sizes of soaked liquid oxygen cartridges to be equivalent kg. as per manufacturer’s instruction. PART – V (General Geology & Mining) (Details on items 1,2,6 & 7(i) may be given once in 5 years)

1. Mineral(s) worked and their characteristics : (In case more than one mineral is worked, the information asked for under (a) to (d) in respect of the remaining mineral(s) may be furnished in a separate sheet and attached with the return)

(a) Name of mineral :

(b) Type of ore (Tick mark whichever is applicable)

(i) Lump

(ii) Fines

(iii) Friable

(iv) Granular

(v) Platy

(vi) Fibrous

(vii) Any other (specify), Powdery etc.

(c) Quality:

Chemical Analysis of Typical Grades Produced Constituent Grade

(i) Size Range

(iii) Subsidiary Constituents 2.(a) Name of rock/mineral excavated and disposed as waste:

(b) Name(s) of the ore/mineral excavated but not sold i.e., mineral reject:

(c) Typical analysis of mineral reject(s) Item 1. 2. 3. 4.

Mineral reject

3. Reserves and Resources estimated at the end of the year.

Classification Code Quantity Grade (as per NMI grades as indicated in the mining plan) Total Mineral Resources (A + B) A. Mineral Reserve

1. Proved Mineral Reserve

2. Probable Mineral Reserve

1. Feasibility Mineral Resource

2. Prefeasibility Mineral Resource

3. Measured Mineral Resource

4. Indicated Mineral Resource

5. Inferred Mineral Resource 121 and 122 221 and 222 Note.- For the removal of doubts, the classification terms and codes mentioned in this Form shall have the same meaning as assigned to them in the Guidelines issued by Indian Bureau of Mines in this regard.

4. Mining Operations during the year:

4.1. Exploration Item Number Meterage Grid/Dimension (as applicable) Drilling Trenching Pitting 4.2 Opencast (A) Details of Benches (Separately for mechanised and manual sections) In ore In OB/Waste

(i) Number of Benches

(ii) Average height (metres)

(iiii) Depth of the deepest working from adjacent ground (M): (B) (i) Total ROM Ore production (tonnes):

(ii) Mineral Rejects generated with grades (tonnes):

(C) Total quantity of Overburden/Waste removed during the year (tonnes) During the year Cumulative so far

(i) Quantity back filled

(ii) Quantity disposed of in external dumps 4.3 Underground:

(a) Driving (metres) in ore:

(b) Cross Cutting/Footwall Drives (in barren) (Metres) :

(e) Shaft sinking (metres):

(f) Stope preparation (metres):

(g) Tonnage of ore blocked for stoping (tonnes):

(h) Quantity of waste removed (tonnes):

(i) Quantity of mineral rejects generated with grade (tonnes): Within lease area Outside lease area 4.4 i) Number of trees planted during the year ii) Survival rate in percentage

5. Type and aggregate Horse Power of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc. Details of any new machinery added during the year may be furnished with cost. Type of machinery Capacity of each unit No.of units H.P. of each unit electrical (specify) Used in opencast/ 6.(i) Give details of future plans, if any, of exploration and development, production schedule, replacements and expansion of machinery and equipment etc.

(ii) If you have laboratory facilities for R & D and if so, give a brief description: 7.(i) Details of mineral Treatment Plant, if any. Give a brief description of the process capacity of the machinery deployed and its availability. (Enclose Flow Sheet and Material Balance of the Plant).

(ii) Furnish following information every year:

Item Tonnage Average Grade Feed:

Concentrates :

Tailings:

8. Furnish surface and/or underground plans and sections as prepared and brought uptodate (as required under rule 28 of MCDR)

9. Please indicate the salient features which affected mining operations during the year.

PART-VI (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes)

1. Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings 2.Grade-wise Production, Despatches ,Stocks and Ex-mine prices of Processed ore: Grades (% of Mn content) Opening stock at mine head Production Despatches from mine head Closing stock at mine-head Ex-mine price (Rs./ Metric Tonne)

(a) Below 25%

(b) 25% to below 35%

(c) 35% to below 46%

(d) 46% and above 1[(f) Concentrates]

3. Details of Deductions used for computation of Ex_mine price (Rs/Metric Tonne) Deduction claimed Unit ( in Rs/Metric tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for Sale or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b) c)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month. a) b) c) PART-VII: COST OF PRODUCTION Cost of production per tonne of ore/mineral produced Item Cost Per metric tonne

(i) Direct Cost

(a) Exploration

(b) Mining

(iii) Depreciation

(iv) Interest

(v) Royalty

(vi) Taxes

(vii) Dead Rent

(viii) Others (specify) Total Note: Information given under Part VI will be kept confidential, if required. The Government, however, will be free to utilize the information for general studies without revealing the identity or working cost of the firm.

VERIFICATION

I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

Designation: Owner/Agent/ Mining Engineer/Manager

FORM H-3

For the financial year 1st April, 20__ to 31st March, 20____

ANNUAL RETURN

(Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General )

1. Details of Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return)

(c) Name of the Mineral 1[Bauxite/Laterite]

(d) Name of Mine if any, produced from the same mine

2. Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

3. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

4.Registered Office of the Lessee

5. Director in charge :

6. Agent :

7. Manager :

8.Mining Engineer in charge:

9. Geologist in charge :

10. Transferer (previous owner) if any, and date of transfer:

11. Particulars of area operated/Lease (Furnish information on items (i) to (v) lease-wise in case mine workings cover more than one lease)

(i) Area under lease (hectares):

Under Forest Outside Forest I I Total

(ii) Date of execution of mining lease deed

(iii) Period of lease

(iv) Area for which surface rights are held (hectares)

(v) Date and period of renewal (if applicable)

(vi) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced

12. Lease area (surface area) utilisation as at the end of year (hectares): Under forest Outside forest Total

(i) Already exploited & abandoned by opencast (O/C) mining

(ii) Covered under current (O/C) Workings

(iii) Reclaimed/rehabilitated

(iv) Used for waste disposal

(v) Occupied by plant, buildings, residential, welfare buildings & roads

(vi) Used for any other purpose (specify)

(vii) Work done under progressive mine closure plan during the year

13. Ownership/exploiting Agency of the mine:

PART - II (Employment & Wages) 1.Number of technical and supervisory staff employed at the mine Description Wholly employed Partly employed

(i) Graduate Mining Engineer

(ii) Diploma Mining Engineer

(iii) Geologist

(iv) Surveyor

(v) Other administrative clerical and technical supervisory staff Total:- 2.(i) Number of days the mine worked:

(ii) No.of shifts per day:

(iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately . Reasons No of days 3.(i) Employment of Labour and wages paid:- Maximum number of persons employed on any one day during the year: (i)In workings below ground on ......................(a)................. (ii)In all in the mine on ..........................(a)................. Classification Total number of man days worked during the year No. of days worked during the year Average daily number of persons employed Total Wages /Salary bills for the year Direct Contract Total Male Female Total A. Below Ground i) Foreman and mining mates ii) Face workers and Loaders iii) Others i) Foreman and mining mates ii) Face workers and Loaders iii) Others

(i) Clerical & Supervisory Staff. (excluding the superior supervisory staff.)

(ii) Workers in any Attached factory, Workshop or mineral dressing plant.

(iii) Others Total:

3. (ii) Total salaries paid to technical and supervisory staff employed in the mine during the year ( in Rs.)_________________ PART-II A (Capital Structure) (in respect of the mine, beneficiation plant, mine, work-shop, power and water installation) Description As at the beginning of the year Additions during the Year Sold or discarded during the year Depreciation during the year Net closing Balance Estimated market

(iii) Land***

(ii) Building:

Industrial Residential

(iii) Plant and Machinery including transport equipment iv) Capitalised Expenditure such as pre- production exploration, development, major overhaul and repair to machinery etc.(As prescribed under Income Tax Act) Total * In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mines return and also indicate the names of other mines in which the information relates in the form provided above. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.

** Optional and may be furnished in respect of items (i),(ii) and (iii) if the mine owner desires. *** Including any non recurring expenditure incurred on the acquisition of land.

2. Source of Finance (as at the end of the year) :-

(i) Paid up Share Capital (Rs.'000) (iii)Reserve & Surplus (All Types) (iv)Long Term loans outstanding Indicate the names of the leading institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.

3.Interest and Rent (in Rs.’000)

(i) Interest paid during the year

(ii) Rents (excluding surface rent) paid during the year PART - III (Consumption of Materials)

1. Quantity and cost of material consumed during the year Description Unit Quantity Value (Rs.)

(i) Fuel

(a) Coal Tonnes

(ii) Lubricant

(a) Lubricant oil l

(iii) Electricity

(iv) Explosives (furnish full details in Part IV) (vii)Drill roads & kits Nos.

2. Royalty and Rents (in’ 000 Rs.):

I I X Paid for current year Paid towards past arrears

(a) Royalty

3. Compensation paid for felling trees during the year (in Rs)

4. Depreciation on fixed assets Rs

5. Taxes and cesses X Amount in Rs. paid during the year to:

X Central Govt. State Govt.

(i) Sales Tax

(iii) Other taxes & cesses:-

(a) Mineral cess

(b) Cess on dead rent

(c) Others (please specify)

6. Other expenses:

(i) Overheads

(ii) Maintenance

(iii) Money value of other benefits paid to workmen

(iv) Payment made to professional agencies Part –IV (Consumption of Explosives)

1. Licensed capacity of magazine: (specify unit separately in kg/tonne, numbers, metres ) Item Unit Capacity

2. Total production during the year (Tonne):

3. Overburden removed:

Classification of Explosives Unit Quantity consumed during the year Estimated requirement during the next year Small dia.

(upto 32 mm) Large dia. (above 32 mm) Small dia.

(upto 32 mm) Large dia. (above 32 mm) b.Ammonium nitrate in cartridged form cartridges kg 5.Slurry explosives (Mention different trade names) kg i) Ordinary

(a) Ordinary

(b) Delay (a)Safety Fuse (b)Detonating Fuse 9.Others (specify) (Mention the unit) Different sizes of soaked liquid oxygen cartridges to be equivalent kg. as per manufacturer’s instruction. PART – V (General Geology & Mining) (Details on items 1, 2, 6 & 7(i) may be given once in 5 years)

1. Mineral(s) worked and their characteristics : (In case more than one mineral is worked, the information asked for under (a) to (d) in respect of the remaining mineral(s) may be furnished in a separate sheet and attached with the return)

(a) Name of mineral :

(b) Type of ore (Tick mark whichever is applicable)

(i) Lump

(ii) Fines

(iii) Friable

(iv) Granular

(v) Platy

(vi) Fibrous

(vii) Any other (specify), Powdery etc.

(c) Quality:

Chemical Analysis of Typical Grades Produced Constituent Grade

(i) Size Range

(iii) Subsidiary Constituents 2.(a) Name of rock/mineral excavated and disposed as waste:

(b) Name(s) of the ore/mineral excavated but not sold i.e., mineral reject:

(c) Typical analysis of mineral reject(s) Item 1. 2. 3. 4.

Mineral reject

3. Reserves and Resources estimated at the end of the year.

Classification Code Quantity Grade (as per NMI grades as indicated in the mining plan) Total Mineral Resources (A + B) A. Mineral Reserve

1. Proved Mineral Reserve

2. Probable Mineral Reserve

1. Feasibility Mineral Resource

2. Prefeasibility Mineral Resource

3. Measured Mineral Resource

4. Indicated Mineral Resource

5. Inferred Mineral Resource 121 and 122 221 and 222 Note.- For the removal of doubts, the classification terms and codes mentioned in this Form shall have the same meaning as assigned to them in the Guidelines issued by Indian Bureau of Mines in this regard.

4. Mining Operations during the year:

4.1. Exploration Item Number Meterage Grid/Dimension (as applicable) Drilling Trenching Pitting 4.2 Opencast (A) Details of Benches (Separately for mechanised and manual sections) In ore In OB/Waste

(i) Number of Benches

(ii) Average height (metres)

(iii) Depth of the deepest working from adjacent ground (M): (B) (i) Total ROM Ore production (tonnes):

(ii) Mineral Rejects generated with grades (tonnes):

(C) Total quantity of Overburden/Waste removed during the year (tonnes) During the year Cumulative so far

(i) Quantity back filled

(ii) Quantity disposed of in external dumps 4.3 Underground:

(a) Driving (metres) in ore:

(b) Cross Cutting/Footwall Drives (in barren) (Metres) :

(e) Shaft sinking (metres):

(f) Stope preparation (metres):

(g) Tonnage of ore blocked for stoping (tonnes):

(h) Quantity of waste removed (tonnes):

(i) Quantity of mineral rejects generated with grade (tonnes): Within lease area Outside lease area 4.4 i) Number of trees planted during the year ii) Survival rate in percentage

5. Type and aggregate Horse Power of Machinery: Give the following information for the types of machinery in use such as hoist, fans, drills, loaders, excavators, dumpers, haulages, conveyors, pumps, etc. Details of any new machinery added during the year may be furnished with cost. Type of machinery Capacity of each unit No.of units H.P. of each unit electrical (specify) Used in opencast/ 6.(i) Give details of future plans, if any, of exploration and development, production schedule, replacements and expansion of machinery and equipment etc.

(ii) If you have laboratory facilities for R & D and if so, give a brief description: 7.(i) Details of mineral Treatment Plant, if any. Give a brief description of the process capacity of the machinery deployed and its availability. (Enclose Flow Sheet and Material Balance of the Plant).

(ii) Furnish following information every year:

Item Tonnage Average Grade Feed:

Concentrates :

Tailings:

8. Furnish surface and/or underground plans and sections as prepared and brought uptodate (as required under rule 28 of MCDR)

9. Please indicate the salient features which affected mining operations during the year.

PART-VI (PRODUCTION, DESPATCHES AND STOCKS)

(Unit of Quantity in Tonnes)

1. Production and Stocks of ROM ore at Mine-head Category Opening stock Production Closing stock

(a) Open Cast workings 2.Grade-wise Production, Despatches, Stocks and Ex-mine prices of Processed ore: 1[Grades (% of Al2O3 content) Opening stock at mine head Production Despatches from mine head Closing stock at mine- head Ex-mine price (Rs./ Metric Tonne) (B) For use in alumina and aluminium extraction:- (Please furnish averages of the following ranges of grades):

(a) Below 40%

(b) 40% to below 45%

(c) 45% to below 50%

(d) 50% to below 55%

(e) 55% to below 60%

(f) 60% and above (B) For use other than alumina and aluminium metal extraction

(a) Cement

(b) Abrasive

(c) Refractory

(d) Chemical ]

3. Details of Deductions used for computation of Ex_mine price (Rs/Metric Tonne) Deduction claimed Unit ( in Rs/Metric Tonne) Remarks a) Cost of transportation (indicate Loading station and Distance from mine in remarks) b) Loading and Unloading charges c) Railway freight ,if applicable (indicate destination and distance) name of port) e) Charges for Sampling and Analysis f) Rent for the plot at Stocking yard Total (a) to (g)

4. Sales/ Despatches effected for Domestic Consumption and for Exports: Grade Nature of Despatch (indicate whether for 2[ Sale] or Captive consumption or Export) For Domestic Consumption For export Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer ## Quantity Sale value Country Quantity F.O.B Value (Rs.) ## Consignee name and Registration number as allotted by the Indian Bureau of Mines to the buyer (to indicate separately if more than one buyer) for the top five despaches in terms of Quantity ,for the remaining consolidated figure shall be reported with details of despatches as annexure.

NOTE:- Mine owners are required to substantiate domestic sale value/ FOB value for each grade of ore quoted above with copy of invoices.

5. Give reasons for increase/decrease in production/nil production (of primary or associate mineral), if any, during the month compared to the previous month.

a) b)

6. Give reasons for increase/decrease in grade wise ex-mine price (of primary or associate Mineral),if any, during the month compared to the previous month.

a) b) PART-VII: COST OF PRODUCTION Cost of production per tonne of ore/mineral produced Item Cost Per metric tonne

(i) Direct Cost

(a) Exploration

(b) Mining

(iii) Depreciation

(iv) Interest

(v) Royalty

(vi) Taxes

(vii) Dead Rent

(viii) Others (specify) Total Note: Information given under Part VI will be kept confidential, if required. The Government, however, will be free to utilize the information for general studies without revealing the identity or working cost of the firm.

VERIFICATION

I certify that the information furnished above is correct and complete in all respects. Place: Signature Date: Name in full:

Designation: Owner/Agent/ Mining Engineer/Manager

FORM H-4

For the financial year 1st April, 20__ to 31st March, 20____

ANNUAL RETURN

(Read the instructions carefully before filling the particulars) To

(i) The Regional Controller of Mines Indian Bureau of Mines PIN:

(Please address to Regional Controller of Mines in whose territorial jurisdiction the mines falls as notified from time to time by the Controller General, Indian Bureau of Mines under Rule 62 of the Mineral Conservation and Development rules, 1988)

(ii) The State Government PART – I (General )

1. Details of Mine:

(a) Registration number allotted by Indian Bureau of Mines (to give registration number of the mine owner/ agent/ mining engineer/ manager signing the return)

(c) Name of the Mineral Chromite

(d) Name of Mine if any, produced from the same mine

2. Location of the Mine :

Village Post Office District State and PIN Code Fax no: E-mail:

Phone no:

3. Name and Address(s) of Lessee/Owner (along with fax no. and e-mail): Name of Person Post Office District State and PIN Code Fax no: E-mail:

Phone No:

4.Registered Office of the Lessee

5. Director in charge :

6. Agent :

7. Manager :

8.Mining Engineer in charge:

9. Geologist in charge :

10. Transferer (previous owner) if any, and date of transfer:

11. Particulars of area operated/Lease (Furnish information on items (i) to (v) lease-wise in case mine workings cover more than one lease)

(i) Area under lease (hectares):

Under Forest Outside Forest Total

(ii) Date of execution of mining lease deed

(iii) Period of lease

(iv) Area for which surface rights are held (hectares)

(v) Date and period of renewal (if applicable)

(vi) In case there is more than one mine in the same lease area, indicate name of mine and mineral produced

12. Lease area (surface area) utilisation as at the end of year (hectares): Under forest Outside forest Total

(i) Already exploited & abandoned by opencast (O/C) mining

(ii) Covered under current (O/C) Workings

(iii) Reclaimed/rehabilitated

(iv) Used for waste disposal

(v) Occupied by plant, buildings, residential, welfare buildings & roads

(vi) Used for any other purpose (specify)

(vii) Work done under progressive mine closure plan during the year

13. Ownership/exploiting Agency of the mine:

PART - II (Employment & Wages) 1.Number of technical and supervisory staff employed at the mine Description Wholly employed Partly employed

(i) Graduate Mining Engineer

(ii) Diploma Mining Engineer

(iii) Geologist

(iv) Surveyor

(v) Other administrative clerical and technical supervisory staff Total:- 2.(i) Number of days the mine worked:

(ii) No.of shifts per day:

(iii) Indicate reasons for work stoppage in the mine during the year (due to strike, lockout, heavy rain, non-availability of labour, transport bottleneck, lack of demand, uneconomic operations, etc.) and the number of days of work stoppage for each of the factors separately .

Reasons No of days 3.(i) Employment of Labour and wages paid:- Maximum number of persons employed on any one day during the year: (i)In workings below ground on ......................(a)................. (ii)In all in the mine on ..........................(a)................. Classification Total number of man days worked during the year No. of days worked during the year Average daily number of persons employed Total Wages / Salary bills for the year Direct Contra ct Total Male Female Total A. Below Ground i) Foreman and mining mates ii) Face workers and Loaders iii) Others i) Foreman and mining mates ii) Face workers and Loaders iii) Others

(i) Clerical & Supervisory Staff. (excluding the superior supervisory staff.)

(ii) Workers in any Attached factory, Workshop or mineral dressing plant.

(iii) Others Total:

3. (ii) Total salaries paid to technical and supervisory staff employed in the mine during the year ( in Rs.)_________________ PART-II A (Capital Structure) (in respect of the mine, beneficiation plant, mine, work-shop, power and water installation) Description As at the beginning of the year Additions during the Year Sold or discarded during the year Depreciation during the year Net closing Balance Estimated market

(ii) Building:

Industrial Residential

(iii) Plant and Machinery including transport equipment iv) Capitalised Expenditure such as pre- production exploration, development, major overhaul and repair to machinery etc.(As prescribed under Income Tax Act) Total * In case the fixed assets are common to more than one mine, furnish combined information for all such mines together in any one of the mines return and also indicate the names of other mines in which the information relates in the form provided above. In the returns for other mines, give only a cross reference to the particular mine's return where-in the information is included.

** Optional and may be furnished in respect of items (i),(ii) and (iii) if the mine owner desires. *** Including any non recurring expenditure incurred on the acquisition of land.

2. Source of Finance (as at the end of the year) :-

(i) Paid up Share Capital (Rs.'000) (iii)Reserve & Surplus (All Types) (iv)Long Term loans outstanding Indicate the names of the leading institutions such as State Finance Corporation, Industrial Development and other Public Corporations, Co-operative Banks, Nationalised Banks and other sources along with the amount of loan from each source and the rate of interest at which loan has been taken.

3.Interest and Rent (in Rs.’000)

(i) Interest paid during the year

(ii) Rents (excluding surface rent) paid during the year PART - III (Consumption of Materials)

1. Quantity and cost of material consumed during the year Description Unit Quantity Value (Rs.)

(i) Fuel

(a) Coal Tonnes

(ii) Lubricant

(a) Lubricant oil Ltrs.

(iii) Electricity

(iv) Explosives (furnish full details in Part IV) (vii)Drill roads & kits Nos.

I I

2. Royalty and Rents (in’ 000 Rs.):

X Paid for current year Paid towards past arrears

(a) Royalty

3. Compensation paid for felling trees during the year (in Rs)

4. Depreciation on fixed assets Rs

5. Taxes and cesses X Amount in Rs. paid during the year to:

X Central Govt. State Govt.

(i) Sales Tax

(iii) Other taxes & cesses:-

(a) Mineral cess

(b) Cess on dead rent

(c) Others (please specify)

6. Other expenses:

(i) Overheads

(ii) Maintenance

(iii) Money value of other benefits paid to workmen

(iv) Payment made to professional agencies Part –IV ( Consumption of Explosives)

1. Licensed capacity of magazine: (specify unit separately in kg/tonne, numbers, metres ) Item Unit Capacity

2. Total production during the year (Tonne):

3. Overburden removed:

Classification of Explosives Unit Quantity consumed during the year Esitmated requirement during the next year Small dia.

(upto 32 mm) Large dia. (above 32 mm) Small dia.

(upto 32 mm) Large dia. (above 32 mm) b.Ammonium nitrate in cartridged form cartridges Kg.

5.Slurry explosives (Mention different trade names) Kg.

i) Ordinary

(a) Ordinary

(b) Delay (a)Safety Fuse (b)Detonating Fuse 9.Others (specify) (Mention the unit) Different sizes of soaked liquid oxygen cartridges to be equivalent kg. as per manufacturer’s instruction. PART – V (General Geology & Mining) (Details on items 1,2,6 & 7(i) may be given once in 5 years)

1. Mineral(s) worked and their characteristics : (In case more than one mineral is worked, the information asked for under (a) to (d) in respect of the remaining mineral(s) may be furnished in a separate sheet and attached with the return)

(a) Name of mineral :

(b) Type of ore (Tick mark whichever is applicable)

(i) Lump

(ii) Fines

(iii) Friable

(iv) Granular

(v) Platy

(vi) Fibrous

(vii) Any other (specify), Powdery etc.

(c) Quality:

Chemical Analysis of Typical Grades Produced Constituent Grade

(i) Size Range

(iii) Subsidiary Constituents 2.(a) Name of rock/mineral excavated and disposed as waste:

(b) Name(s) of the ore/mineral excavated but not sold i.e., mineral reject:

(c) Typical analysis of mineral reject(s) Item 1. 2. 3. 4.

Mineral reject

3. Reserves and Resources estimated at the end of the year.

Classification Code Quantity Grade (as per NMI grades as indicated in the mining plan) Total Mineral Resources (A + B) A. Mineral Reserve

1. Proved Mineral Reserve

2. Probable Mineral Reserve

1. Feasibility Mineral Resource

2. Prefeasibility Mineral Resource

3. Measured Mineral Resource

4. Indicated Mineral Resource

5. Inferred Mineral Resource 121 and 122 221 and 222 Note.- For the removal of doubts, the classification terms and codes mentioned in this Form shall have the same meaning as assigned to them in the Guidelines issued by Indian Bureau of Mines in this regard.

4. Mining Operations during the year:

4.1. Exploration Item Number Meterage Grid/Dimension (as applicable) Drilling Trenching Pitting 4.2 Opencast (A) Details of Benches (Separately for mechanised and manual sections) In ore In OB/Waste

(i) Number of Benches

(ii) Average height (metres)

(iiii) Depth of the deepest working from adjacent ground (M): (B) (i) Total ROM Ore production (tonnes):

(ii) Mineral Rejects generated with grades (tonnes):

(C) Total quantity of Overburden/Waste removed during the year (tonnes) During the year Cumulative so far

Source and method. Compiled from the enactments of Parliament and of the State legislatures as published on India Code, and republished together with commentary and other original matter under section 52(1)(q)(ii) of the Copyright Act, 1957. Structured, cross-referenced and maintained by eCourtsIndia. Recorded by India Code; the text, where shown, is what its own document carried. This page is not a substitute for legal advice.