The Boilers Act, 2025

Provisional order

In force From 01 May 2025 Act 12 of 2025 As on 21 Oct 2026

Act 12 of 2025 Ministry Commerce and Industry Enacted 04 Apr 2025 In force 01 May 2025 Cited by 2 provisions Instruments 3

Section 14 of the Boilers Act, 2025 deals with provisional order. Where the Inspector reports the case of any boiler to the Chief Inspector under sub-section (4) of section 12, he may, if the use of such boiler or its components is not prohibited under clause (f) of sub-section (1) of section 13 as being in a dangerous condition, grant to the owner thereof a provi The Act came into force on 01 May 2025.

(1) Where the Inspector reports the case of any boiler to the Chief Inspector under sub-section (4) of section 12, he may, if the use of such boiler or its components is not prohibited under clause (f) of sub-section (1) of section 13 as being in a dangerous condition, grant to the owner thereof a provisional order in writing, permitting the boiler to be used at a pressure not exceeding such maximum pressure as he thinks fit and in accordance with the regulations made under this Act, pending the receipt of the order of the Chief Inspector.

(2) Such provisional order shall cease to be in force---

(i) on the expiry of six months from the date on which it is granted; or

(ii) on receipt of the orders of the Chief Inspector; or

(iii) in any of the cases referred to in clauses (b), (c), (d), (e) and (f) of sub-section (1) of section 13,

and on so ceasing to be in force, shall be surrendered to the Inspector.

Section 14, The Boilers Act, 2025 (Act 12 of 2025).

Cross-references

Extracted from the operative text of the enactments themselves. Every destination below exists in our corpus.

Made under this section, and citing it

3 instruments name this provision in its title or its text without being made under it.

All subordinate legislation

Questions about Section 14

What does Section 14 of the Boilers Act deal with?

Section 14 of the Boilers Act is headed "Provisional order". Where the Inspector reports the case of any boiler to the Chief Inspector under sub-section (4) of section 12, he may, if the use of such boiler or its components is not prohibited under clause (f) of sub-section (1) of section 13 as being in a dangerous condition, grant to the owner thereof a provi

How do I find court cases under Section 14 of the Boilers Act?

In judgments and charge sheets this section is written several ways, and each form finds a different set of orders. These search the full text of every order eCourtsIndia holds, best matches first: Boilers Act 2025 14, section 14 Boilers Act 2025, section 14 of the Boilers Act. Each opens the full list of orders on eCourtsIndia, where it can be narrowed by court, year and outcome.

What should I read with Section 14 of the Boilers Act, and has it changed?

Its own text turns on section 12 (Registration), section 13 (Renewal of certificate), so none of them can safely be read on its own. 2 other provisions in this corpus refer back to it. 3 instruments name it without being made under it, most recently The Tripura Boilers Rules, 1983 (2015), then The Maharashtra Boiler Rules, 1962 (1962).

When did Section 14 of the Boilers Act come into force?

Section 14 of the Boilers Act, cited as Boilers Act 2025 14, came into force on 01 May 2025, having been enacted on 04 Apr 2025. It is in force as at the date shown on this page.

Other sections of this Act

Source and method. Compiled from the enactments of Parliament and of the State legislatures as published on India Code, and republished together with commentary and other original matter under section 52(1)(q)(ii) of the Copyright Act, 1957. Structured, cross-referenced and maintained by eCourtsIndia. Text as in force on 21 Oct 2026. This page is not a substitute for legal advice.