Power of Board to make regulations
Section 40 of the Boilers Act, 2025 deals with power of Board to make regulations. The Board may, by notification and subject to the condition of previous publication, make regulations not inconsistent with this Act and the rules made thereunder, to carry out the provisions of this Act. The Act came into force on 01 May 2025.
(1) The Board may, by notification and subject to the condition of previous publication, make regulations not inconsistent with this Act and the rules made thereunder, to carry out the provisions of this Act.
(2) In particular, and without prejudice to the generality of the foregoing power, such regulations may provide for all or any of the following matters, namely:---
(a) the manner of recognition of person as competent person under clause (g) of section 2;
(b) the manner of recognition of institution as inspecting authority under clause (j) of section 2;
(c) the manner of recognition of competent authority under sub-section (1) of section 6;
(d) the welders certificate under sub-section (2) of section 6;
(e) the procedure for examination and grant of welders certificate under sub-section (3) of section 6;
(f) the other conditions and fee and for grant of welders certificate under sub-section (4) of section 6;
(g) the facilities for design and construction of boiler and boiler components under clause (a) of section 7;
(h) the specifications for material, mounting and fitting used in the construction of boiler or boiler components under clause (c) of section 7;
(i) the stages of inspection during manufacture of boiler or boiler components by the inspecting authority under sub-section (1) of section 8;
(j) the procedure for inspection and certification of boiler or boiler components by the inspecting authority under sub-section (2) of section 8;
(k) the standard for design and drawing of boiler or boiler components under clause (a) of sub-section (3) of section 8;
(l) the fee for inspection of boiler or boiler components during manufacture under sub-section (4) of section 8;
(m) the procedure for inspection and certification of a boiler or boiler components during erection under sub-section (2) of section 9;
(n) the standards for erection of a boiler; and the form of certificate of inspection under clause (a) of sub-section (3) of section 9;
(o) the fee payable for inspection during erection under sub-section (4) of section 9;
(p) the facilities for repairing of boiler and boiler components under clause (a) of sub-section (1) of section 10;
(q) the standards for design and drawings of the boiler or boiler components, and the specifications for material, mounting and fitting used in the repair of the boiler or boiler components, under clause (b) of sub-section (1) of section 10;
(r) the measures for the safety of person working inside a boiler under clause (f) of sub-section (1) of section 10;
(s) the manner of obtaining a certificate under sub-section (2) of section 10;
(t) the manner of reporting of transfer of boiler under clause (b) of sub-section (1) of section 11;
(u) the form along with the drawings, specification, certificate and other documents for registration under sub-section (1) of section 12;
(v) the form for grant of certificate to the owner authorising the use of the boiler under sub-section (6) of section 12;
(w) the manner and time in which the register number shall be marked on the boiler under sub-section (8) of section 12;
(x) the form, documents and fee for renewal of certificate under sub-section (3) of section 13;
(y) the manner for inspection of the boiler under sub-section (4) of section 13;
(z) the validity period of the certificate under clause (a) of sub-section (5) of section 13;
(za) the standards for boiler or boiler components under clause (b) of sub-section (5) of section 13;
(zb) the terms and conditions for the renewal of certificate under sub-section (6) of section 13;
(zc) the particulars of proposed alteration, addition or renewal of steam-pipe and other boiler components under sub-section (1) of section 18;
(zd) the manner of preparation of the boiler or boiler components for examination under clause (b) of sub-section (1) of section 19;
(ze) the drawing, specification, certificate and other particulars to be provided to the competent person under clause (c) of sub-section (1) of section 19;
(zf) the manner of disconnecting the boiler under clause (c) of section 29;
(zg) the conditions for exemption of any boiler or boiler components under sub-section (4) of section 38;
(zh) for any other matter relating to design, manufacture, erection and use of boiler and boiler components which is to be regulated by the Board.
Section 40, The Boilers Act, 2025 (Act 12 of 2025).
Cross-references
Extracted from the operative text of the enactments themselves. Every destination below exists in our corpus.
This section refers to
- s. 2 Definitions
- s. 6 Competent authority to grant welders certificate
- s. 7 Conditions precedent for manufacture of boiler and boiler components
- s. 8 Inspection during manufacture
- s. 9 Inspection during erection
- s. 10 Conditions precedent for repairing boiler and boiler components
- s. 11 Prohibition of use of unregistered or uncertified boiler
- s. 12 Registration
- s. 13 Renewal of certificate
- s. 18 Alteration and renewal of steam-pipe or boiler components
- s. 19 Duty of owner at examination
- s. 29 Punishment for certain offences
- s. 38 Exemptions
Referred to by 2
Questions about Section 40
What does Section 40 of the Boilers Act deal with?
Section 40 of the Boilers Act is headed "Power of Board to make regulations". The Board may, by notification and subject to the condition of previous publication, make regulations not inconsistent with this Act and the rules made thereunder, to carry out the provisions of this Act.
How do I find court cases under Section 40 of the Boilers Act?
In judgments and charge sheets this section is written several ways, and each form finds a different set of orders. These search the full text of every order eCourtsIndia holds, best matches first: Boilers Act 2025 40, section 40 Boilers Act 2025, section 40 of the Boilers Act. Each opens the full list of orders on eCourtsIndia, where it can be narrowed by court, year and outcome.
What should I read with Section 40 of the Boilers Act, and has it changed?
Its own text turns on section 2 (Definitions), section 6 (Competent authority to grant welders certificate), section 7 (Conditions precedent for manufacture of boiler and boiler components), section 8 (Inspection during manufacture), and on 9 further provisions, so none of them can safely be read on its own. 2 other provisions in this corpus refer back to it.
When did Section 40 of the Boilers Act come into force?
Section 40 of the Boilers Act, cited as Boilers Act 2025 40, came into force on 01 May 2025, having been enacted on 04 Apr 2025. It is in force as at the date shown on this page.
Other sections of this Act
- 2. Definitions637 words
- 13. Renewal of certificate560 words
- 12. Registration481 words
- 45. Repeal and savings396 words
- 5. Chief Inspector, Deputy Chief Inspector and Inspector363 words
- 3. Central Boilers Board324 words
Source and method. Compiled from the enactments of Parliament and of the State legislatures as published on India Code, and republished together with commentary and other original matter under section 52(1)(q)(ii) of the Copyright Act, 1957. Structured, cross-referenced and maintained by eCourtsIndia. Text as in force on 20 Oct 2026. This page is not a substitute for legal advice.