Conditions precedent for manufacture of boiler and boiler components
Section 7 of the Boilers Act, 2025 deals with conditions precedent for manufacture of boiler and boiler components. No person shall manufacture or cause to be manufactured any boiler or boiler components, or both, unless--- (a) the premises or precincts wherein boiler or boiler components, or both, are manufactured, have such facilities for design and construction as may be specified by regulations; The Act came into force on 01 May 2025.
No person shall manufacture or cause to be manufactured any boiler or boiler components, or both, unless---
(a) the premises or precincts wherein boiler or boiler components, or both, are manufactured, have such facilities for design and construction as may be specified by regulations;
(b) a certificate for the design and drawings of the boiler and boiler components have been granted by the inspecting authority under clause (a) of sub-section (3) of section 8;
(c) the material, mounting and fitting used in the construction of boiler or boiler components, or both, conform to such specifications as may be specified by regulations; and
(d) the person engaged in welding boiler or boiler components hold welders certificate granted by the competent authority under sub-section (4) of section 6.
Section 7, The Boilers Act, 2025 (Act 12 of 2025).
Cross-references
Extracted from the operative text of the enactments themselves. Every destination below exists in our corpus.
This section refers to
Referred to by 1
Made under this section, and citing it
4 instruments name this provision in its title or its text without being made under it.
Questions about Section 7
What does Section 7 of the Boilers Act deal with?
Section 7 of the Boilers Act is headed "Conditions precedent for manufacture of boiler and boiler components". No person shall manufacture or cause to be manufactured any boiler or boiler components, or both, unless--- (a) the premises or precincts wherein boiler or boiler components, or both, are manufactured, have such facilities for design and construction as may be specified by regulations;
How do I find court cases under Section 7 of the Boilers Act?
In judgments and charge sheets this section is written several ways, and each form finds a different set of orders. These search the full text of every order eCourtsIndia holds, best matches first: Boilers Act 2025 7, section 7 Boilers Act 2025, section 7 of the Boilers Act. Each opens the full list of orders on eCourtsIndia, where it can be narrowed by court, year and outcome.
What should I read with Section 7 of the Boilers Act, and has it changed?
Its own text turns on section 6 (Competent authority to grant welders certificate), section 8 (Inspection during manufacture), so none of them can safely be read on its own. 1 other provision in this corpus refers back to it. 4 instruments name it without being made under it, most recently Notification of RMSME Act 2019 (2019), then The Tripura Boilers Rules, 1983 (2015).
When did Section 7 of the Boilers Act come into force?
Section 7 of the Boilers Act, cited as Boilers Act 2025 7, came into force on 01 May 2025, having been enacted on 04 Apr 2025. It is in force as at the date shown on this page.
Other sections of this Act
- 40. Power of Board to make regulations709 words
- 2. Definitions637 words
- 13. Renewal of certificate560 words
- 12. Registration481 words
- 45. Repeal and savings396 words
- 5. Chief Inspector, Deputy Chief Inspector and Inspector363 words
Source and method. Compiled from the enactments of Parliament and of the State legislatures as published on India Code, and republished together with commentary and other original matter under section 52(1)(q)(ii) of the Copyright Act, 1957. Structured, cross-referenced and maintained by eCourtsIndia. Text as in force on 20 Oct 2026. This page is not a substitute for legal advice.